Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. MUSTAFA TALAT BİRGÖNÜL
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  http://blog.metu.edu.tr/birgonul/
Phone :  +90312210 2427
Fax :  +903122105401
Address :
 

Education

  Bachelor's, Middle East Technical University, Civil Eng.
  Master's, Middle East Technical University, Civil Eng.
  Doctorate, Middle East Technical University, Civil Eng.

Research

Thesis Supervised

  A.1 Concrete Construction Under Different Climatic Conditions and Factors Affecting the Cost Estimate. Msc Thesis. Jamal Lababidi. (1988)
  A.2 A Computer Program Related to Some Standard Earthwork Equipments. Msc Thesis. Bassem Jarkas. (1989)
  A.3 Linear Construction Planning Technique. Msc Thesis. Hakan Çaka. (1989)
  A.4 Probabilistic Quantity Estimation of Basic Construction Items by Linear Regression Method. Msc Thesis. Vuslat Özkaramete. (1989)
  A.5 A Survey on the Construction Equipment Supply and Importation of Turkish Overseas Contractors Upon Completion of Their Contracts. Msc Thesis. Ramazan Çuhadar. (1989)
  A.6 Thermal Insulation and Energy Conservation Measures for Low-Cost Housing. Msc Thesis. Tuncer Şahin. (1991)
  A.7 The Integration of CPM and Material Management in Project Management. Msc Thesis. Erta Taşkınsoy. (1991)
  A.8 A Methodology for the Evaluation of Proposals Tendered on the Basis of Built-Operate-Transfer Model. Msc Thesis. Ahmet Korkmaz. (1991)
  A.9 Measures for Improving Quality and Maintaining Economy in Low-Cost Housing Projects. Msc Thesis. Can Erdoğan. (1992)
  A.10 Effect of Inflation and Payment Delay on Profit Margin Under Unit Price Contract and the Compensation Methods. Msc Thesis. Abdulrezak Nurhussein Mohamed. (1992)
  A.11 An Expert System Approach to Concrete Supervising and Precast Connections. Msc Thesis. Şeref Topkaya. (1992)
  A.12 An Elastic Timing Method Proposed for Construction Schedules. Msc Thesis. Ayşe Sibel Yanıkömeroğlu. (1992)
  A.13 Critical Review of Quality and Time Control Aspects in Some Major Libyan Construction Projects. Msc Thesis. Abdalla Ömer Mahmud. (1993)
  A.14 A Case Study on the Interaction Between Time and Cost Constituents of a Mass Housing Construction Project. Msc Thesis. Arzu Barçın Yılmaz. (1993)
  A.15 An Evaluation of Value Management Practice in Turkish Construction Sector. Msc Thesis. Aylin Aslan. (1995)
  A.16 An Expert System Approach Based on Şanlıurfa Irrigation Tunnel Construction Experiences. Msc Thesis. Birol Akpınar. (1995)
  A.17 The French Model of Water Distribution, Sewage Collection and Treatment Administration Under Private Company Management. Msc Thesis. Mustafa Tunç Erk. (1995)
  A.18 Turkish Contracting Sector: An Organisational Survey of Turkish Contracting Companies. Msc Thesis. Irmak Renda. (1995)
  A.19 Risk Analysis of Construction Projects Based on Unit Prices Under Inflationary Conditions. Msc Thesis. Deniz Elmas. (1996)
  A.20 Management of Political Risks in Public Non-Building Construction Projects. Msc Thesis. Murat Sefik Yazan. (1996)
  A.21 Time, Cost and Quality Management of Mass Housing Projects. Msc Thesis. Mehmetcan Topuz. (1996)
  A.22 Current Construction Quality Control Systems Used in Turkey and Suggestions for Further Improvements. Msc Thesis. Irfan Cetin. (1996)
  A.23 Risk Management of BOT Projects in Developing Countries. Msc Thesis. Irem (Dikmen) Ozdogan. (1996)
  A.24 Economic Analysis of Multi-Stage Housing Production Model. Msc Thesis. Mustafa Kaan. (1996)
  A.25 An Overview of the CIS Construction Market and Guidelines for Foreign Construction Companies. Msc Thesis. O. Mutlu Sinman. (1996)
  A.26 Cost in Quality Assurance in Construction. Msc Thesis. Ertan Kökçüoğlu. (1997)
  A.27 Toplu Konut İnşaatlarında Düşük Kaliteden Kaynaklanan Maliyetler. Phd Thesis. Aynur Kazaz. (1997)
  A.28 CPM Applications and Problems Faced in Turkish Construction Sector. Msc Thesis. Atila Yurdakul. (1998)
  A.29 A Reliability Based Risk Assessment Model for Coastal Projects. Phd Thesis. Can Elmar Balas. (1998)
  A.30 Evaluation of the Subcontracting System in Turkey. Msc Thesis. Ebru Gökcek. (1998)
  A.31 Risk Perception and Trends of Turkish Construction Companies. Msc Thesis. Ayşegül Petek (Yener)Gürsel. (1998)
  A.32 Risk Analysis and Cost Simulation of Coastal Projects. Msc Thesis. Mehmet Ali Ersarı. (1998)
  A.33 Investigation of State Procurement Law and Amendments Necessary to Make It Consistent with the World Bank Practices. Msc Thesis. Çağlar Sürücü. (1998)
  A.34 Performance of Turkish Contractors Working Abroad. Msc Thesis. Mete Metin. (1998)
  A.35 Development of a Quality Assurance System for Highways in Turkey. Msc Thesis. Dilruba Özmen. (1998)
  A.36 ISO 9000 Standards in the Turkish Construction Industry. Msc Thesis. Derya Türk Türkan. (1999)
  A.37 Effects of Economic Recession Periods on Turkish Construction Companies. Msc Thesis. Levent Çağrı Ogan. (2000)
  A.38 Refinement of Benefit-Cost Analysis Results for Highway Projects. Msc Thesis. Nilhan (Erdal) Özkan. (2000)
  A.39 Critical Review of Construction Machinery Costs within the Context of General Price Analysis. Msc Thesis. Sinan Öztabak. (2000)
  A.40 Problems Faced by Foreign Contractors Working in Turkey. Msc Thesis. Sibel Önen. (2000)
  A.41 A Genetic Algorithm for Multi-mode Resource Constrained Project Scheduling. Msc Thesis. Burak Güvenç. (2000)
  A.42 A Comparative Study on the Reliability-Based Risk Assessment in Project Management of Coastal Structures. Msc Thesis. Gökhan Pişkin. (2000)
  A.43 Value Management Approach for the Selection of Construction Materials for the Buildings Owned by Air Force Command. Msc Thesis. Savaş Deren. (2001)
  A.44 Dispute Creation and Resolution Mechanisms of the Turkish Construction Sector in Public Projects. Msc Thesis. Göksu Günay. (2001)
  A.45 Strategic Decision Making in Construction Companies: An Artificial Neural Network Based Decision Support System for International Market Selection. Phd Thesis. İrem Dikmen. (2001)
  A.46 İhale Yönetimi Bilgi Sistemleri. Phd Thesis. Gökhan Aslan. (2002)
  A.47 An Innovation Management Model for Construction Companies: Case Studies from the Turkish Construction Industry. Msc Thesis. Sami Umut Artuk. (2002)
  A.48 Marketing in the Turkish Construction Industry. Msc Thesis. İsmail Özcenk. (2002)
  A.49 An Organisational Learning Framework as a Driver of Organisational Performance of Turkish Construction Companies. Msc Thesis. Tunca Ataoğlu. (2002)
  A.50 Impact of Construction Management Graduate Education on Professional Life. Msc Thesis. Ebru Çanga. (2002)
  A.51 Organisational Effectiveness in Turkish Construction Companies: An Artificial Neural Network Based Prediction Model. Msc Thesis. Semiha Kızıltaş. (2002)
  A.52 Organizational memory in construction companies: A case-based reasoning model as an organizational learning tool. Msc Thesis. Beliz Özorhon. (2004)
  A.53 Case based decision support system for bid markup estimation of international construction projects at the tender stage. Msc Thesis. Ahmet Kemal Gur. (2005)
  A.54 Determination of contingency for international construction projects during bidding stage. Msc Thesis. A. Arif Ergin. (2005)
  A.55 Development of a risk management decision support system for international construction projects. Msc Thesis. Arif Erdem Arıkan. (2005)
  A.56 An expert system for the quantification of fault rates in construction fall accidents. Msc Thesis. Tuncay Demirel. (2005)
  A.57 Comparison of international federation of consulting engineers and general specification for public works contracts from risk management perspective. Msc Thesis. Ergun Usta. (2005)
  A.58 Quantification of acceleration claims: a simplified approach. Msc Thesis. Ali Özge Ilgar. (2005)
  A.59 Country risk assessment in the construction industry. Phd Thesis. Aslı Akçamete. (2006)
  A.60 Critical success factors for partnering in the Turkish construction industry. Msc Thesis. Köksal Eren. (2007)
  A.61 Modeling the performance of international construction joint ventures. Phd Thesis. Beliz Özorhon. (2007)
  A.62 Organizational decline and bankruptcy prediction model for the Turkish construction companies. Msc Thesis. Nurdan Eğilmezer Şapçı. (2007)
  A.63 Development of a risk assessment tool for post-project appraisal. Msc Thesis. Caner Anaç. (2007)
  A.64 Risk assessment of international construction projects using the analytic network process. Msc Thesis. Amani Suliman Bu-Qammaz. (2007)
  A.65 Using cognitive maps for modeling project success. Msc Thesis. Güzide Atasoy. (2007)
  A.66 A RISK AND VULNERABILITY ONTOLOGY FOR CONSTRUCTION PROJECTS. Msc Thesis. GÜLŞAH FİDAN. (2008)
  A.67 IDENTIFICATION OF RISK PATHS IN CONSTRUCTION PROJECTS. Msc Thesis. GÜLBİN ÖZCAN. (2008)
  A.68 DEVELOPING A STRATEGIC INFORMATION SYSTEM FOR CONSTRUCTION COMPANIES. Msc Thesis. TANYELİ GÜNEŞ. (2008)
  A.69 DETERMINATION OF STRATEGIC GROUPS OF MAJOR TURKISH CONSTRUCTION COMPANIES BY USING SELF ORGANIZING MAP AND CLUSTER ANALYSIS. Phd Thesis. CENK BUDAYAN. (2008)
  A.70 Development of an activity based assessment tool using integrated duration- cost influence network. Msc Thesis. Ahmet Hamdi Özer. (2009)
  A.71 A conceptual performance measurement framework for construction industry. Phd Thesis. Zeynep Işık. (2009)
  A.72 Contract management behavior of Turkish construction companies in international projects. Msc Thesis. Muhammet Alper Yiğit. (2009)
  A.73 IDENTIFICATION OF RISK PATH IN INTERNATIONAL CONSTRUCTION PROJECTS. Msc Thesis. MATINEH EYBPOOSH. (2010)
  A.74 DEVELOPMENT OF A MULTI AGENT SYSTEM FOR NEGOTIATION OF COST OVERRUN IN INTERNATIONAL CONSTRUCTION PROJECTS. Msc Thesis. KIVANÇ KARAKAŞ. (2010)
  A.75 INSTITUTIONALIZATION OF CONSTRUCTION FIRM : TURKISH CONTRACTORS' EXPERIENCE. Msc Thesis. ÖZLEM YAVUZYILMAZ. (2010)
  A.76 DEVELOPMENT OF AN EXPERT SYSTEM FOR THE QUANTIFICATION OF FAULT RATES IN TRAFFIC ACCIDENTS. Msc Thesis. EREN CANGUL. (2010)
  A.77 ANALOGICAL REASONING FOR RISK ASSESSMENT AND COST OVERRUN ESTIMATION IN CONSTRUCTION PROJECTS. Msc Thesis. ONUR ÇELENLİGİL. (2010)
  A.78 IDENTIFICATION AND REPRESENTATION OF INFORMATION ITEMS REQUIRED FOR VULNERABILITY ASSESSMENT AND MULTI-HAZARD EMERGENCY RESPONSE OPERATIONS. Msc Thesis. NURAY GÖKDEMİR. (2011)
  A.79 AN ONTOLOGY-BASED APPROACH FOR DELAY ANALYSIS. Msc Thesis. GÖZDE BİLGİN. (2011)
  A.80 ROUTE MAP OF TURKISH INTERNATIONAL CONSTRUCTION SERVICES - LESSONS LEARNT AND RECOMMENDATIONS FOR THE FUTURE. Msc Thesis. AYDIN SAKIN. (2011)
  A.81 COUNTRY FACTORS EFFECTS ON AIRPORT BOT PROJECTS. Msc Thesis. MOHAMMAD KASHEF. (2011)
  A.82 ORGANIZATIONAL ROUTINES IN CONSTRUCTION PROJECTS. Msc Thesis. MARYAM DANESHVAR. (2011)
  A.83 A DECISION SUPPORT TOOL FOR FEASIBILITY ASSESSMENT OF HYDRO ELECTRICAL POWER PLANT PROJECTS. Msc Thesis. NOYAN ERCAN. (2011)
  A.84 A MODEL-BASED GUIDANCE AND VULNERABILITY ASSESSMENT APPROACH FOR FACILITIES UNDER THE THREAT OF MULTI-HAZARD EMERGENCIES. Msc Thesis. MURAT AYHAN. (2012)
  A.85 DEVELOPING A KNOWLEDGE TAXONOMY FOR BUSINESS DEVELOPMENT IN CONSTRUCTION COMPANIES: A CASE OF TURKISH CONSTRUCTION INDUSTRY. Msc Thesis. AMIN HAGHGOOIE. (2012)
  A.86 DEVELOPMENT OF A KNOWLEDGE BASED RISK MAPPING TOOL FOR INTERNATIONAL CONSTRUCTION PROJECTS. Msc Thesis. AÇELYA ECEM YILDIZ. (2012)
  A.87 OCCUPATIONAL HEALTH AND SAFETY HAZARD IDENTIFICATION, RISK ASSESSMENT, DETERMINING CONTROLS: CASE STUDY ON CUT-AND-COVER UNDERGROUND STATIONS AND TUNNEL CONSTRUCTION. Msc Thesis. CUMHUR CEYHAN. (2012)
  A.88 A TAXONOMY FOR CAUSES OF CHANGES IN CONSTRUCTION. Msc Thesis. BABAK RAHMANI MIRSHEKARLOU. (2012)
  A.89 SHORTCOMINGS OF DELAY ANALYSIS PRACTICES: A CASE STUDY USING AN INTEGRATED APPROACH. Msc Thesis. ŞİNASİ BEKTAŞ. (2012)
  A.90 COMPARISON OF FIDIC CONDITIONS OF CONTRACT (1999) AND UNCITRAL LEGAL GUIDE FROM PROSPECTIVE DISPUTES AND CLAIMS PERSPECTIVE. Msc Thesis. FATMA PELİN AKTUĞ. (2012)
  A.91 A FUZZY DELAY ASSESSMENT TOOL FOR CONSTRUCTION PROJECTS. Msc Thesis. AYDIN GHAZIANI. (2012)
  A.92 IDENTIFYING THE EFFECTS OF LEAN CONSTRUCTION PRINCIPLES ON VARIABILITY OF PROJECT DURATION. Msc Thesis. HACI HÜSEYİN EROL. (2014)
  A.93 SOCIAL NETWORK ANALYSIS OF CONSTRUCTION COMPANIES OPERATING IN INTERNATIONAL MARKETS: THE CASE OF TURKISH CONTRACTORS. Msc Thesis. BARTUĞ KEMAL AKGÜL. (2014)
  A.94 USING MONTE CARLO SIMULATION AND MULTI-AGENT SYSTEMS TO ESTIMATE FINANCIAL FEASIBILITY OF HEPP PROJECTS TENDERED ON A BOT BASIS: A CASE STUDY FROM TURKEY. Phd Thesis. EMRE CANER AKÇAY. (2014)
  A.95 FACTORS AFFECTING THE RISK RATINGS ASSIGNED BY DECISION-MAKERS UNDER UNCERTAIN SITUATIONS: THE CASE OF INTERNATIONAL CONSTRUCTION. Msc Thesis. EHSANULLAH HAYAT. (2014)
  A.96 BUFFER SIZING MODEL WITH FUZZY ASSESSMENT ON CONCRETE GRAVITY DAM AND HEPP PROJECTS. Msc Thesis. ŞEMSETTİN BALTA. (2014)
  A.97 FALL FROM FRAGILE ROOF. Msc Thesis. SELMAN YALÇIN. (2014)
  A.98 THE FUTURE OF GREEN BUILDING CONTRACTS IN TURKEY. Msc Thesis. SAHRA MOHAMMADI. (2015)
  A.99 A FUZZY STRUCTURAL EQUATION MODEL TO ANALYZE RELATIONSHIPS BETWEEN DETERMINANTS OF SAFETY PERFORMANCE IN CONSTRUCTION SITES: DEVELOPMENT OF A SAFETY PERFORMANCE INDEX ASSESSMENT TOOL. Phd Thesis. MUSTAFA ÖZDEMİR. (2015)
  A.100 TURKISH CONTRACTORS IN THE PROJECT FINANCE OF POWER PROJECTS IN SUB-SAHARAN AFRICA (SSA). Msc Thesis. OVIC MBI MABIALA. (2015)
  A.101 THE EVALUATION OF CONSTRUCTION PROJECTS REALIZED WITH PUBLIC PRIVATE PARTNERSHIP MODEL IN TURKEY. Msc Thesis. OSMAN CAN ÜREL. (2015)
  A.102 GLOCALIZATION IN INTERNATIONAL CONSTRUCTION PROJECTS. Msc Thesis. ÖZGÜR SÖNMEZ. (2016)
  A.103 A STUDY ON THE PRICE ESCALATION SYSTEM IN PUBLIC CONSTRUCTION CONTRACTS IN TURKEY. Msc Thesis. MUHAMMED ERCAN. (2017)
  A.104 DEVELOPMENT OF A LESSONS LEARNED MANAGEMENT PROCESS MODEL AND A WEB-BASED TOOL FOR CONSTRUCTION COMPANIES. Msc Thesis. GÖRKEM EKEN. (2017)

Project Work

  A.1 Input-output Analysis of the Turkish Construction Industry. The British Council, 1 MARCH 1998 - 1 MARCH 2001. Coordinator .
  A.2 Metro 3. Aşama Prefizibilite Etüdü. EGO Genel Müdürlüğü, 1 JUNE 1998 - 1 JULY 1998. Coordinator .
  A.3 Input-output analysis of the Turkish construction industry. The British Council, 1 APRIL 1998 - 1 MARCH 2001. Coordinator .
  A.4 Metro 2. Aşama Fizibilite Etüdü. EGO Genel Müdürlüğü, 1 SEPTEMBER 1998 - 1 SEPTEMBER 1998. Coordinator .
  A.5 Input Output Analysis of the Turkish Construction Industry. The British Council, 1 APRIL 1998 - 1 MARCH 2001. Coordinator .
  A.6 OECD'ye Bağlı Ülkelerde Satınalma Gücü Paritesi Kapsamında Yer Alan 9 Adet İnşaat Projesinin Fiyatlandırılması. T.C. Başbakanlık Devlet İstatistik Enstitüsü Başkanlığı, 1 NOVEMBER 1999 - 1 DECEMBER 1999. Coordinator .
  A.7 Malzeme ve Sistem Ömürlerinin Belirlenmesi ve Standardizasyon Çalışmaları (I. Aşama). T.C. Hava Kuvvetleri Komutanlığı, 1 APRIL 1999 - 1 DECEMBER 1999. Coordinator .
  A.8 EUROSTAT ile Yürütülen Satınalama Gücü Paritesi Kapsamında 12 Adet İnşaat Projesinin fiyatlandırılması. TC Başbakanlık Devlet İstatistik Enstitüsü Başkanlığı, 1 AUGUST 2000 - 1 OCTOBER 2000. Coordinator .
  A.9 Gölgeli Sok. No:5'te Bulunan Taşınmazın Yapı Güvenliği ve Maliyet Açısından İncelenmesi. İskenderun Enerji Üretim ve Ticaret A.Ş., 1 SEPTEMBER 2000 - 1 SEPTEMBER 2000. Coordinator .
  A.10 TC Merkez Bankası Eğitim ve Sosyal Tesisleri İnşaatının İhale Sistemine İlişkin Değerlendirme. TC Merkez Bankası, 1 JULY 2000 - 1 JULY 2000. Researcher .
  A.11 Trabzon Hava Limanı İnşaatı İşinin İncelenmesi. TC Devlet Hava Meydanları İşletmesi, 1 APRIL 2001 - 1 MAY 2001. Coordinator .
  A.12 EUROSTAT ile Yürütülen Satın Alma Gücü Paritesi Programında Yeralan 12 İnşaat Projesinin Fiyatlandırılması. TC Başbakanlık Devlet İstatistik Enstitüsü Başkanlığı (DİE), 1 JULY 2001 - 1 SEPTEMBER 2001. Coordinator .
  A.13 Tokat Hava Limanı İşinin İncelenmesi. TC Hava Meydanları İşletmesi, 1 JUNE 2001 - 1 JULY 2001. Coordinator .
  A.14 Rusya Federasyonu Moskova'nın Voskressensk Şehrinde Bulunan Çikolata Fabrikası İnşaatı İşinin İncelenmesi. Zafer Taahhüt Elektrik İnşaat ve Ticaret A.Ş., 1 SEPTEMBER 2001 - 1 OCTOBER 2001. Researcher .
  A.15 Mardin Hava Limanı İnşaatı İşinin İncelenmesi. TC Devlet Hava Meydanları İşletmesi, 1 JULY 2001 - 1 AUGUST 2001. Coordinator .
  A.16 EUROSTAT ile Yürütülen Satın Alma Gücü Paritesi Programında Yeralan 8 İnşaat Projesinin Fiyatlandırılması. TC Başbakanlık Devlet İstatistik Enstitüsü Bşk., 1 SEPTEMBER 2002 - 1 NOVEMBER 2002. Coordinator .
  A.17 Türk İnşaat Şirketlerinde İnovasyon Yönetimi. BAP, 1 MAY 2002 - 1 MAY 2003. Coordinator .
  A.18 Türk İnşaat Şirketlerinde Organizasyonel Etkinlik ve Performans Değerlendirmesi. BAP, 1 MAY 2002 - 1 MAY 2003. Researcher .
  A.19 Development of a Risk Register Database System to Aid Management of Risk in Construction Projects. British Council, 1 JUNE 2005 - 1 JUNE 2007. Researcher .
  A.20 Development of a Risk Register Database System to Aid Management of Risks in Construction Projects. OTHER INTERNATIONAL AGENCIES British Council, 1 JUNE 2005 - 1 JUNE 2007. Researcher .
  A.21 Development of a Risk Register Database System to Aid Management of Risk in Construction Projects. British Council, 1 JUNE 2005 - 1 JUNE 2007. Researcher .
  A.22 Develeopment of a Multi-Agent Based Risk Modelling Tool for International Construction Projects. TUBİTAK Projects , 1 OCTOBER 2007 - 1 DECEMBER 2007. Researcher .
  A.23 Muratlı Barajındaki Talep Konularının İncelenmesi. DSİM Projects , 1 JUNE 2007 - 1 JULY 2007. Local Coordinator .
  A.24 İnşaat Projelerinin Fiyatlandırılması. DSİM Projects , 1 MAY 2007 - 1 MAY 2007. Local Coordinator .
  A.25 Development of a Multi-Agent Based Risk Modelling Tool for International Construction Projects. TUBİTAK Projects , 1 JANUARY 2008 - 1 DECEMBER 2008. Researcher .
  A.26 Pricing of 9 construction projects within the framework of EUROSTAT Purchasing Power Parity Programme. DSİM Projects , 1 APRIL 2009 - 1 MAY 2009. Local Coordinator .
  A.27 Development of a Multi-agent Based Risk Modelling Tool for International Construction Projects. TUBİTAK Projects , 1 JANUARY 2009 - 1 DECEMBER 2009. Researcher .
  A.28 Bina bilgi modelleri (Building information models-BIM) ve Radyo Frekanslı Tanımlama Teknolojileri (RFID) arasında veri ve bilgi transferi için gereken veri protokollerinin belirlenmesi.. BAP-1 (Excluding thesis supports) , 1 JANUARY 2009 - 1 DECEMBER 2010. Local Coordinator .
  A.29 Binalarda Çeşitli Tehlikelerin Yarattığı Acil Durumlar için Eş Zamanlı Hasar Tesbit, Yerel Tahliye, Yönlendirme ve Yönetim Modeli. TUBİTAK Projects , 1 MARCH 2010 - 1 SEPTEMBER 2012. Local Coordinator .
  A.30 İnşaat Projeleri için Bilgi Tabanlı Risk Haritalama Aracının Geliştirilmesi. SANTEZ, AFAD, Development Agency, TAEK, SAYP, TUJJB, SSM , Ministries (all ministries except Ministry of development), BOREN , 1 DECEMBER 2010 - 1 DECEMBER 2012. Researcher .
  A.31 İnşaat Projeleri için Bilgi Tabanlı Risk Haritalama Aracının Geliştirilmesi. SANTEZ, AFAD, Development Agency, TAEK, SAYP, TUJJB, SSM , Ministries (all ministries except Ministry of development), BOREN , 1 DECEMBER 2010 - 1 DECEMBER 2012. Researcher .
  A.32 Binalarda Çeşitli Tehlikelerin Yarattığı Acil Durumlar Için Eş Zamanlı Hasar Tesbit, Yerel Tahliye, Yönlendirme ve Yönetim Modeli. TUBİTAK Projects , 1 MARCH 2010 - 1 SEPTEMBER 2012. Local Coordinator .
  A.33 Uluslararasi İnşaat Projeleri İçin Çok Aracili Bir Risk Modelleme Platformunun Geliştirilmesi. TUBİTAK Projects , 1 JANUARY 2010 - 1 OCTOBER 2010. Researcher .
  A.34 İnşaat Projelerinin Fiyatlandırılması Çalışması. DSİM Projects , 1 JUNE 2011 - 1 AUGUST 2011. Local Coordinator .
  A.35 Binalarda Çeşitli Tehliklerin Yarattığı Acil Durumlar İçin Eş Zamanlı Hasar Tesbit, Yerel Tahliye, Yönlendirme ve Yönetim Modeli. TUBİTAK Projects , 1 JANUARY 2012 - 1 OCTOBER 2012. Local Coordinator .
  A.36 İnşaat Projeleri için Bilgi Tabanlı Risk Haritalama Aracının Geliştirilmesi. SANTEZ, AFAD, Development Agency, TAEK, SAYP, TUJJB, SSM , Ministries (all ministries except Ministry of development), BOREN , 1 JANUARY 2012 - 1 DECEMBER 2012. Researcher .
  A.37 İnşaat Projelerinin Fiyatlandırılması. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JULY 2013 - 1 SEPTEMBER 2013. Local Coordinator .
  A.38 İstanbul Carrefour Ticaret Merkezi ile İlgili Bağımsız Uzman Raporu Düzenlenmesi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 APRIL 2013 - 1 JUNE. Local Coordinator .
  A.39 Sarıgüzel Barajı ve HES Projesinde Gecikme Analizi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 SEPTEMBER 2013 - 1 SEPTEMBER 2013. Local Coordinator .
  A.40 Türkmenistan Garlyk Potosayum Maden Projesi İçin Bağımsız Uzman Raporu Düzenlenmesi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 JULY 2013 - 1 JULY. Local Coordinator .
  A.41 Analysis of delays encountered in the Sarıgüzel Dam and HEPP Project. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 JANUARY 2014 - 1 JANUARY. Local Coordinator .
  A.42 Development of an IT-based tool for portfolio assessment and management for construction companies. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 MARCH 2014 - 1 DECEMBER 2014. Researcher .
  A.43 Preperation of independent expert report to be submitted to the Antalya Court regarding the disputed cost items. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 DECEMBER 2014 - 1 DECEMBER. Local Coordinator .
  A.44 Preperation of independent expert report to be submitted to the international arbitration board, regarding the Ankara-İstanbul High Speed Train Project-Phase 2. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 OCTOBER 2014 - 1 OCTOBER. Local Coordinator .
  A.45 Analysis of delays encountered in the Çambaşı Diversion Weir and HEPP Project. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 FEBRUARY 2014 - 1 FEBRUARY. Local Coordinator .
  A.46 Determination of progress level achieved at Çigdem Diversion Weir and HEPP Project. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MAY 2014 - 1 MAY. Local Coordinator .
  A.47 Evaluation of disputes experienced in the retro fitting and repair works of Istanbul Provincial Police Headquarters Project. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MARCH 2014 - 1 MARCH. Local Coordinator .
  A.48 Pricing Study for the Selected Construction and Civil Engineering Projects. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JULY 2015 - 1 AUGUST 2015. Local Coordinator .
  A.49 MESKİ İçme Suyu Rehabilitasyon Projesi Kapsamında Vuku Bulan Kaza ile İlgili Uzman Raporu Düzenlenmesi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 APRIL 2015 - 1 APRIL 2015. Local Coordinator .
  A.50 Filyos Limanı İnşaatı İşinde Taş Nakli Pozunun Değerlendirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MAY 2015 - 1 MAY 2015. Local Coordinator .
  A.51 Adana İli Seyhan İlçesi'ndeki Taşınmazdaki Daire Sayısı ve Dairelerin Alanlarına İlişkin Uyuşmazlıkla İlgili Teknik Mütalaa. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 DECEMBER 2016 - 1 DECEMBER. Local Coordinator .
  A.52 Erzurum Kayakla Atlama Kulelerinde Heyelan Nedeniyle Meydana Gelen Hasarda Yüklenici Firma Kusurunun Bulunup Bulunmadığına Yönelik Teknik Mütalaa. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 APRIL 2016 - 1 APRIL. Local Coordinator .
  A.53 Beylerbeyi-Küçüksu Atıksu Tüneli Yapım İşinde Menfi Zarar Hesaplanmasına Yönelik Teknik Mütalaa. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 DECEMBER 2016 - 1 DECEMBER 2016. Local Coordinator .
  A.54 TÜİK PROJESİ. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 JULY 2016. Local Coordinator .
  A.55 Satınalma gücü paritesi hesaplamalarında kullanılmak üzere 7 adet inşaat projesinin fiyatlandırılması. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2017 - 1 JULY 2017. Local Coordinator .
  A.56 Bandırma II kombine çevrim elektrik santralinin boru montaj işlerinde yaşanan gecikmelere ilişkin bağımsız uzman raporu hazırlanması. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 FEBRUARY 2017 - 1 FEBRUARY 2017. Local Coordinator .
<< back