  Bachelor's, Middle East Technical University, Electric-electronic. Eng.
  Master's, The Ohio State University, Electric-electronic. Eng.
  Doctorate, The Ohio State University, Electric-electronic. Eng.

Research

Patents

  A.1 Prof.Dr.Nezih Güven, Prof.D.Nevzat Özay, Ayhan Büyüksemerci, Dağıtm Otomasyon Sistemi. "Türk Patent Enstitüsü", 200302277, (2006).

Thesis Supervised

  A.1 Object Oriented User Interface for Power System Analysis Simulation Package. Msc Thesis. Oğuz Onay. (1998)
  A.2 Implementation of Linear Programming Based Optimum Power Flow. Msc Thesis. İlhan Alpay. (1999)
  A.3 Self-excitation of Induction Motors Compensated by Permanently Connected Capacitors. Msc Thesis. Zafer Çakır. (2000)
  A.4 Determination of Real Time External System Equivalents for Power System Contingency Analysis. Msc Thesis. Tamer Özden. (2000)
  A.5 An Object-Oriented Approach to Geographical Information Systems Applications for Electric Distribution Systems. Msc Thesis. Savaş Yürekli. (2001)
  A.6 Switching Overvoltages on the New Interconnection Between Turkey and Bulgaria. Msc Thesis. Osman Bülent Tör. (2001)
  A.7 Evaluation of Wheeling Based on Optimum Power Flow. Msc Thesis. Ahmet Karademir. (2001)
  A.8 Subsynchronous Resonance Analysis for Elbistan-2 Thermal Power Plant . Msc Thesis. Ulaş Karaağaç. (2002)
  A.9 CONGESTION-DRIVEN TRANSMISSION PLANNING CONSIDERING INCENTIVES FOR GENERATOR INVESTMENTS. Phd Thesis. OSMAN BÜLENT TÖR. (2008)
  A.10 MODELING AND INVESTIGATION OF FAULT RIDE THROUGH CAPABILITY OF VARIABLE SPEED WIND TURBINES . Msc Thesis. ERKAN KOÇ. (2010)
  A.11 ASSESSMENT OF THE EFFECT OF HYDROELECTRIC POWER PLANTS GOVERNOR SETTINGS ON LOW FREQUENCY INTER AREA OSCILLATIONS. Msc Thesis. CİHANGİR GENÇOĞLU. (2010)
  A.12 DISTRIBUTION NETWORK RECONFIGURATION FOR LOSS REDUCTION BY MULTI BRANCH EXCHANGE METHOD . Msc Thesis. BIRZHAN GALYMOV. (2012)
  A.13 Short Term Electricity Price Forecasting in Turkish Electricity Market. Msc Thesis. Erdem Ozguner. (2012)
  A.14 PRICE BASED UNIT COMMITMENT WITH RESERVE CONSIDERATIONS. Msc Thesis. ALİ OKUŞLUĞ. (2013)
  A.15 STOCHASTIC WIND-THERMAL GENERATION COORDINATION FOR TURKISH DAY-AHEAD ELECTRICITY MARKET. Msc Thesis. AYCAN AYDOĞDU. (2014)
  A.16 TECHNICAL EVALUATION OF SYNCHRONOUS INTERCONNECTION BETWEEN MASHRIQ COUNTRIES. Msc Thesis. GÖKHAN YASİN UYSAL. (2014)
  A.17 OPTIMIZATION OF LOCATION AND NUMBER OF LIGHTNING ARRESTERS IN 420 KV SUBSTATIONS IN TURKISH HIGH VOLTAGE ELECTRICITY SYSTEM. Msc Thesis. MERT OZAN TULAZ. (2014)
  A.18 OPTIMAL BIDDING STRATEGIES FOR DAY AHEAD ELECTRICITY MARKET BY RISK CONSTRAINED STOCHASTIC PRICE BASED UNIT COMMITMENT. Msc Thesis. AMIR SHILEH BAF. (2014)
  A.19 DETERMINATION OF WIND POWER POTENTIAL AND OPTIMAL WIND POWER PLANT LOCATIONS IN TURKEY. Msc Thesis. HALE ÇETİNAY. (2014)
  A.20 DESIGN OF A SPECIAL PROTECTION SCHEME AND SUPPLEMENTARY CONTROLS REGARDING HVDC BACK TO BACK INTERCONNECTION BETWEEN TURKEY AND GEORGIA. Msc Thesis. ÖZGÜR TANIDIR. (2014)
  A.21 TRANSMISSION SYSTEM SECURITY STUDY FOR AKKUYU NUCLEAR POWER PLANT. Msc Thesis. SİNAN EREN. (2014)
  A.22 DETERMINATION OF OPTIMUM VALUES FOR VOLTAGE SETPOINTS OF POWER STATIONS IN TURKEY. Msc Thesis. İSMAİL ELMA. (2014)
  A.23 OPTIMAL DETERMINATION AND ALLOCATION OF SECONDARY FREQUENCY CONTROL RESERVE IN A MARKET ENVIRONMENT CONSIDERING ACE CRITERIA. Msc Thesis. ALİ GEREN. (2014)
  A.24 ASSESSMENT OF IMPACTS OF ELECTRIC VEHICLES ON LOW VOLTAGE DISTRIBUTION NETWORKS IN TURKEY. Msc Thesis. ARMAĞAN TEMİZ. (2015)

Project Work

  A.1 Design and Implementation of a Distribution System Automation for İstanbul Electric Network. BEDAŞ, TÜBİTAK-ODTÜ-BİLTEN, 1 FEBRUARY 1996 - 1 DECEMBER 1999. Researcher .
  A.2 Master Planning of Istanbul Anatolian Side Electric Distribution and Transmission Network. AKTAŞ-BİLTEN, 1 DECEMBER 1996 - 1 FEBRUARY 1998. Researcher .
  A.3 Design and Implementation of a Feeder Automation System for Istanbul Distribution Network. BEDAŞ, BİLTEN, 1 JANUARY 1998 - 1 DECEMBER 1998. Researcher .
  A.4 Design and Implementation of Train Heating System. ASELSAN-PARMAŞ, 1 SEPTEMBER 1998 - 1 FEBRUARY 1999. Researcher .
  A.5 Losses in the Istanbul Electric Distribution Network. ISEDAŞ, PARMAŞ, 1 JUNE 1998 - 1 AUGUST 1998. Researcher .
  A.6 Evaluation of Losses in İstanbul Electric Distribution Network. İSEDAS A.Ş.-PARMAŞ, 1 JUNE 1998 - 1 SEPTEMBER 1998. Researcher .
  A.7 Design and Implementation of a Heating System for Electric Trains in Elazığ. ASELSAN, PARMAŞ, 1 JANUARY 1999 - 1 APRIL 1999. Coordinator .
  A.8 Adapazarı CCNG Plant Subsynchronous Resonance Risk. BİLTEN, 1 MARCH 2000 - 1 JUNE 2000. Researcher .
  A.9 Design and Implementation of a Feeder Automation System for Istanbul Distribution Network. Boğaziçi Elektrik A.Ş., BİLTEN, 1 JANUARY 2000 - 1 DECEMBER 2000. Researcher .
  A.10 TransEuropean Energy Network: Technical and Economic Feasibility of a New EHV Line between Greece and Turk. European Union, TEAŞ, 1 FEBRUARY 2000 - 1 DECEMBER 2000. Coordinator .
  A.11 Subsynchronous Resonance Risk for İskenderun Thermal Plant. TÜBİTAK-BİLTEN, 1 JUNE 2001 - 1 AUGUST 2001. Coordinator .
  A.12 Türkiye'ye ve KKTC'ye Yabancı Öğrenci Kazandırılması. Basbakanlık, 1 JANUARY 2003 - 1 DECEMBER 2003. Coordinator .
  A.13 Türkiye'ye ve KKTC'ye Yabancı Öğrenci Kazandırılması. Başbakanlık Tanıtma Fonu, 1 JANUARY 2004 - 1 DECEMBER 2004. Coordinator .
  A.14 Türkiye'ye ve KKTC'ye yabancı öğrenci kazandırılması. Başbakanlık Tanıtma Fonu, 1 JANUARY 2005 - 1 DECEMBER 2005. Coordinator .
  A.15 Eurostudent Projesi (Üniversite Öğrencilerinin Sosyo-Ekonomik Profilinin Çıkarılması). Avrupa Komisyonu ve Alman Federal Eğitim ve Bilim Bakanlığı, 1 JANUARY 2006 - 1 JULY 2007. Coordinator .
  A.16 Türkiye'ye ve KKTC'ye Yabancı öğrenci Kazandırılması. Başbakanlık Tanıtma Fonu, 1 JANUARY 2006 - 1 JUNE 2006. Coordinator .
  A.17 Eurostudent Projesi, Üniversite Öğrencilerinin Sosyo-Ekonomik Profilinin Çıkarılması (Destek: YÖK ve AB). PARTLY NATIONAL- PARTLY INTERNATIONAL A project whose budget constitutes less than 50% international funding , 1 JANUARY 2007 - 1 DECEMBER 2007. Local Coordinator .
  A.18 Erasmus Mundus Extension Cooperation Window (lots 6, 7, 8). EU , 1 JANUARY 2007 - 1 DECEMBER 2007. Local Coordinator .
  A.19 Eurostudent III 2005-08 (Ulusal Rapor: http://www.eurostudent.eu/publications ). PARTLY NATIONAL- PARTLY INTERNATIONAL A project whose budget constitutes less than 50% international funding , 1 JANUARY 2008 - 1 DECEMBER 2008. Local Coordinator .
  A.20 Yüksek Gerilim Sisteminin Gelişen Piyasa Koşulları ve Yenilenebilir Enerji Kaynakları Göz Önüne Alınarak Tasarımı ve Planlaması. TEKNOKENT Projects , 1 FEBRUARY 2011 - 1 AUGUST 2011. Researcher .
  A.21 Güç Sistemleri için tahmin sistemi ve şebeke analiz destek platformu geliştirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments Hacettepe Teknoparkşirketi EPRA'ya uluslararası proje danışm, 1 DECEMBER 2014 - 1 NOVEMBER 2015. Researcher .
  A.22 Güç Sistemleri için Tahmin Sistemi ve Şebeke Analiz Destek Platformu Geliştirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) Hacettepe Teknopark firması EPRA ile, 1 DECEMBER 2014 - 1 DECEMBER 2015. Local Coordinator .
  A.23 Dağıtık Jenerator Şebeke Bağlantıları için Sistematik Analiz ve Raporlama Algoritmaları Geliştirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 FEBRUARY 2017 - 1 DECEMBER 2017. Local Coordinator .

Consultancy and Expert Reports

  A.1 H-174 ve H-188 Enerji İletim Hatları Projelerindeki İhtilaflar ve Sorunlar. World Bank (Project No: 4344-TU), TEİAŞ, (11.2003)
  A.2 H-164 ve H-182 Enerji İletim Hatları Projelerindeki Sorunlar. World Bank (Project No: 4344-TU), TEİAŞ, (12.2004)
  A.3 380 Kv Erzurum-Yusufeli iletim hattı sorunları. TEİAŞ ve Dünya Bankası, (7.2005)
  A.4 İyidere-Borçka (H-180) iletim hattındaki sorunlar. TEİAŞ ve Dünya Bankası, (3.2005)
  A.5 Dünya Bankasının H-176 no'lu 380 kV Tirebolu-Kalkandere İletim Hattı Projesi. TEİAŞ ve Dünya Bankası, (6.2006)
  A.6 380 kV Ağrı Trafo Merkezi. TEİAŞ ve Dünya Bankası, (6.2006)
  A.7 170 kV Ümraniye GIS Trafo Merkezi. TEİAŞ ve Dünya Bankası, (10.2006)
  A.8 380 kV Adapazarı-Dokurcun İletim Hattı. TEİAŞ ve Dünya Bankası, (10.2006)
  A.9 Dünya Bankası H-176 referanslı Proje: 380 kV Tirebolu-İyidere (Kalkandere) İletim Hattındaki Sorunlar. TEİAŞ ve EMTAMİTAŞ-AKPE Konsorsiyumu, (2.2009)
  A.10 Balfour Beatty (UK) şirketi ile TEİAŞ arasında, Dünya Bankasının H-180 no’lu Sözleşmesi çerçevesinde imzalanan 380 kV İyidere-Borçka iletim hattının yapımında ortaya çıkan ihtilaflar. Balfour Beatty (İngiltere), TEİAŞ, Dünya Bankası, (7.2011)
  A.11 Balfour Beatty (UK) ile TEİAŞ arasında, Dünya Bankasının H-180 no'lu Sözleşmesi çerçevesinde imzalanan 380 kV İyidere-Borçka iletim hattının yapımında ortaya çıkan ihtilaf. Balfour Beatty şirketi (UK), TEİAŞ, Dünya Bankası, (5.2012)
  A.12 Smart Grid in the Electricity Transmission: Feasibility Study in Turkey. U.S. Trade and Development Agency (USTDA), (2.2016)