Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. SADIK ENGİN KILIÇ (RETIRED)
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  -
Phone :  
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Mechanical Eng.
  Master's, UMIST, Manchester, Manufac.& Machine Tools Div.
  Doctorate, UMIST, Manchester, Manufac.& Machine Tools Div.

Research

Thesis Supervised

  A.1 Development of a Structured Methodology for Flexible Manufacturing Systems. Phd Thesis. Can Saygın. (1997)
  A.2 Generation of Flexible Process Plans Using Feature Recognition. Msc Thesis. Hakan Boran. (1998)
  A.3 An Investigation into the Cutting Tools Used in CNC Machines. Msc Thesis. T. Tolga Taşgın. (1998)
  A.4 Cutting Tool Selection and Cutting Data Optimization for Nickel-Based Superalloys. Msc Thesis. Semih Platin. (1998)
  A.5 An Investigation into the Loading of Parts into an FMS with Cyclic Schedules. Msc Thesis. Sinan Özlü. (1998)
  A.6 Development of a Database Program for Assembly Line Operations. Msc Thesis. Ahmet Özsınmaz. (1998)
  A.7 An Interactive Process Planning System for Prismatic Parts. Msc Thesis. Cafer Baş. (1999)
  A.8 Finite Element Analysis of Orthogonal Metal Cutting Operations. Phd Thesis. Mustafa Usta. (1999)
  A.9 Development of a Distributed Shop Floor Control System. Msc Thesis. Barış Tengirşenk. (1999)
  A.10 Development of A Job Shop Planning System: Optimization of Machining Operations Using Windows DNA Architecture. Msc Thesis. Burak Sarı. (2001)
  A.11 Development of a Web-Based Job-Shop Scheduling System in CIM Environment. Msc Thesis. Murat Kaan Akalp. (2002)
  A.12 Simulation of Orthogonal Metal Cutting by Finite Element Analysis. Msc Thesis. Halil Bil. (2003)
  A.13 Development of a Tool Management System for a Job Shop. Msc Thesis. Başar Budak. (2003)
  A.14 Feature Based Design of Rotatioanal Parts Based on STEP. Msc Thesis. Tahir Fidan. (2004)
  A.15 Development of a Step Feature-Based Intelligent Process Planning System for Prismatic Parts. Phd Thesis. Amaitik, S.M.. (2005)
  A.16 Simulation of a Flexible Manufacturing System: A Pilot Implementation. Msc Thesis. Yücel, N.D.. (2005)
  A.17 Development of a Database Managemnt System for Small and Medium Sized Enterprizes. Msc Thesis. Şafak, Ç.. (2005)
  A.18 Methodology Development for Small and Medium Sized Enterprise (SME) Based Virtual Enterprises”, 2006.. Phd Thesis. Sarı, B.. (2006)
  A.19 Die Stress and Friction Behaviour Analysis in Bolt Forming. Msc Thesis. Aygen, M.. (2006)
  A.20 Assessment of Roll-Formed Products Including the Cold Forming Effects. Msc Thesis. Alper Güner. (2007)
  A.21 Development of a Bidding Algorithm used in an Agent-Based Shop-Floor Control System. Msc Thesis. Muhtar Ural Uluer. (2007)
  A.22 AN INVESTIGATION INTO THE IMPLEMENTATION OF STEP METHODOLOGY IN AVIATION INDUSTRY. Msc Thesis. KADİR AKKUŞ. (2011)
  A.23 DEVELOPMENT OF A MINIATURIZED AUTOMATED PRODUCTION CONTROL SYSTEM.. Msc Thesis. ÖZGÜR KORKMAZ. (2012)

Project Work

  A.1 Restructuring a Large Scale Discrete Manufacturing Plant as a Holonic System (REMAPHOS)-2nd Working Group Me. EUREKA, 1 MARCH 1998 - 1 MARCH 1998. Researcher .
  A.2 Development of a Computer Aided Quality Control Software to Detect Machining Errors on Complex Rotational. TÜBİTAK-OMFB Turkish-Hungarian Coop., 1 JANUARY 1998 - 1 JANUARY 1998. Researcher .
  A.3 Design, Development and Implemplementation of an Integrated Production Management System. TUBİTAK-OMFB Turkish-Hungarian Coop., 1 JANUARY 1998 - 1 JANUARY 1998. Researcher .
  A.4 Bilgisayar Sayısal Denetimli Tezgahların Dağıtık Sayısal Denetim ile Tümleşimi. TUSAŞ Motor Sanayii A.Ş, 1 JULY 1998 - 1 JULY 1999. Coordinator .
  A.5 İleri İmalat Sistemleri ve Teknolojileri AR-GE Merkezi Kurma Çalışması. TUBİTAK-TİDEB, 1 MARCH 1998 - 1 DECEMBER 1999. Coordinator .
  A.6 Developing a Shop Floor Control System Using Work Flow Technology for Agile Manufacturing. DPT, 1 APRIL 1999 - 1 FEBRUARY 2002. Coordinator .
  A.7 Installation of a Pneumatic Linear Positioning Device to the CIM Lab. of the Mech. Eng.. Research Fund, 1 JUNE 1999 - 1 DECEMBER 2000. Coordinator .
  A.8 Development of an Education Test Bed for the Implementation of Distributed Internet Applications in MES. TÜBİTAK and OTKA of Hungary, 1 JANUARY 2002 - 1 JANUARY 2004. Coordinator .
  A.9 Microsoft Windows DNA Mimarisi ile Ajan Temelli Bir Sanal İmalat Sistemi Geliştirilmesi. DPT, 1 JUNE 2002 - 1 MAY 2004. Coordinator .
  A.10 SAGE'nin Çalışmaları Kapsamında Üretim Sistemi Geliştirme Projesi. TÜBİTAK-SAGE, 1 MARCH 2002 - 1 FEBRUARY 2003. Coordinator .
  A.11 Küçük ve Orta Ölçekli İşletmeler (KOBİ) için İmalat Yönetim Sistemi (İYS) Geliştirilmesi. TÜBİTAK, 1 MARCH 2002 - 1 MARCH 2004. Coordinator .
  A.12 Dev. of an Ed.Test Bed for the Imp. of Distributed Internet Applications in MES(EDNA). TÜBİTAK and OTKA of Hungary, 1 JANUARY 2002 - 1 JANUARY 2004. Coordinator .
  A.13 Microsoft Windows DNA mimarisi ile ajan temelli bir sanal imalat sistemi geliştirilmesi. DPT, 1 JUNE 2002 - 1 JANUARY 2004. Coordinator .
  A.14 OSTİM’de Küçük ve Orta Ölçekli İşletmelere Yönelik Sanal Fabrika Sisteminin Geliştirilmesi. TUBİTAK Projects , 1 SEPTEMBER 2006 - 1 AUGUST 2008. Local Coordinator .
  A.15 OSTIM'de Küçük ve Orta Ölçekli İşletmelere Yönelik Sanal Fabrika Sisteminin Geliştirilmesi. TÜBİTAK, 1 OCTOBER 2006 - 1 JUNE 2008. Coordinator .
  A.16 Development of a Virtual Manufacturing System For SMEs at OSTIM. TUBİTAK Projects , 1 NOVEMBER 2006 - 1 MAY 2008. Local Coordinator .
  A.17 İleri İmalat Sistemleri ve Teknolojileri Ar-Ge İşbirliği Ağı ve Platformu Projesi. TUBİTAK Projects , 1 JANUARY 2007 - 1 JULY 2010. Local Coordinator .
  A.18 İleri İmalat Sistemleri ve Teknolojileri Ar-Ge İşbirliği Ağı ve Platformu Projesi. TEKNOKENT Projects , 1 JULY 2007 - 1 JULY 2010. Local Coordinator .
  A.19 Advanced Manufacturing Systems and Technologies Collaborative R & D Network and Platform. TUBİTAK Projects , 1 JANUARY 2007 - 1 JULY 2010. Local Coordinator .
  A.20 İleri İmalat Sistemlaeri ve Teknolojileri Ar-Ge İşbirliği Ağı ve Platformu. TUBİTAK Projects , 1 JULY 2007 - 1 JUNE 2011. Local Coordinator .
  A.21 İleri İmalat Sistemleri ve Teknolojileri Ar-Ge İşbirliği Ağı ve Platformu. TUBİTAK Projects , 1 JANUARY 2010 - 1 DECEMBER 2010. Local Coordinator .
  A.22 Katma Değeri Yüksek Ürünlerin KOBİ´ler tarafından Üretilmesi için Operasyonel Sanal Fabrika Sisteminin Geliştirilmesi. SANTEZ, AFAD, Development Agency, TAEK, SAYP, TUJJB, SSM , Ministries (all ministries except Ministry of development), BOREN , 1 OCTOBER 2012 - 1 OCTOBER 2014. Local Coordinator .
  A.23 MANUFUTURE-TR, Geleceğin İmalat Sistemleri ve Teknolojileri, Türkiye Platformu: OSTIM’de kurulu küme yapılanmaları içindeki KOBİ’lerin birlikle katma degeri yüksek ürün geliştirmeleri ve üretebilmeleri için bir Sanal Fabrika Sisteminin geliştirilmesi. TEKNOKENT Projects , 1 FEBRUARY 2012 - 1 FEBRUARY 2013. Local Coordinator .
  A.24 Katma Değeri Yüksek Ürünlerin KOBİ´ler tarafından Üretilmesi için Operasyonel Sanal Fabrika Sisteminin Geliştirilmesi. Projects within the scope of Development of Collaborations between University and Industry SAN-TEZ, TUBITAK 1505 etc. , 1 APRIL 2012 - 1 APRIL 2015. Local Coordinator .
  A.25 Eko Verimli Üretim için bir Sistem ve Yöntem Geliştirilmesi. TEKNOKENT Projects , 1 SEPTEMBER 2012 - 1 NOVEMBER 2013. Local Coordinator .
<< back