Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. ÖMER KIRCA
FACULTY OF ENGINEERING
PublicationsResearch
E-mail :  
Url :  -
Phone :  
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Industrial Eng.
  Master's, Middle East Technical University, Industrial Eng.
  Doctorate, Georgia Institute of Technology, Industrial Eng.

Research

Thesis Supervised

  A.1 A Branch and Bound Algorithm to Minimize Total Weighted Flowtime for the Two-Stage Assembly Scheduling Problem. Msc Thesis. Ali Tozkoporan. (1999)
  A.2 A Mixed Model Line Scheduling Problem with Makespan Minimization. Phd Thesis. Banu Soylu. (2002)
  A.3 A MIXED MODEL LINE SEQUENCING PROBLEM WITH LINE IDLE TIME MINIMIZATION. Msc Thesis. UĞUR ARIKAN. (2009)
  A.4 ASSEMBLY LINE BALANCING FOR MIX PRODUCTION. Msc Thesis. EMRE UÇAR. (2010)
  A.5 CONSTRUCTING A HEURISTIC PROCEDURE IN SINGLE MACHINE SCHEDULING TARDINESS PROBLEM. Msc Thesis. SAFFET İLKER ÖZBAKIR. (2011)
  A.6 AMMUNITION TRANSFER SYSTEM OPTIMIZATION PROBLEM. Msc Thesis. HATİCE SİNEM GÜNSEL. (2012)
  A.7 MULTI-LAYER NETWORK DESIGN PROBLEMS IN TELECOMMUNICATION. Phd Thesis. İNCİ YÜKSEL ERGÜN. (2013)
  A.8 A two stage approach for hybrid-assembly line design. Msc Thesis. Doğukan Şimşek. (2014)

Project Work

  A.1 A Tabu Search Algorithm for Machine-Cell Formation Problem. EUREKA/FACTORY Project EU-1584, 1 JANUARY 1998 - 1 JANUARY 1998. Researcher .
  A.2 A Conceptual Model for MPS-MRP-CRP Operation in Holonic Manufacturing. EUREKA/FACTORY Project EU-1584, 1 JANUARY 1998 - 1 JANUARY 1998. Researcher .
  A.3 Sayıştay Denetimini Geliştirme Projesi. Sayıştay, 1 FEBRUARY 2001 - 1 MAY 2001. Researcher .
  A.4 IMPROVING TRAFFIC SAFETY IN OYAK-RENAULT CAR FACTORY IN BURSA. Oyak-Renault, 1 MARCH 2004 - 1 MAY 2004. Researcher .
  A.5 Filyos Limanı. EU , 1 JANUARY 2009 - 1 SEPTEMBER 2010. Researcher .
  A.6 ASELSAN A.Ş.. DSİM Projects , 1 JANUARY 2010 - 1 JANUARY 2011. Local Coordinator .
  A.7 ASELSAN A.Ş.. DSİM Projects , 1 JANUARY 2010 - 1 JANUARY 2011. Local Coordinator .
  A.8 ASELSAN A.Ş. PROJESİ. DSİM Projects , 1 NOVEMBER 2011 - 1 OCTOBER 2012. Local Coordinator .
  A.9 Ateş Destek Alanı Modelleme Çalışması. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2013 - 1 NOVEMBER 2014. Local Coordinator .
  A.10 ASELSAN A.Ş. PROJESİ. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MARCH 2013 - 1 AUGUST 2013. Local Coordinator .
  A.11 Füze- TDST Algoritması Kavramsal Tasarım. Teknokent Project and Consultancy Teknokent Project and Consultancy Parge, 1 JANUARY 2014 - 1 DECEMBER 2014. Local Coordinator .
<< back