Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Assist.Prof.Dr GÜLİZAR ÖZYURT TARAKCIOĞLU
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  -
Phone :  +90312210 5436
Fax :  +903122101800
Address :
 

Education

  Bachelor's, Middle East Technical University, Civil Eng.
  Master's, Middle East Technical University, Coastal And Harbor Engineering
  Doctorate, Middle East Technical University, Coastal And Harbor Engineering

Research

Thesis Supervised

  A.1 ASSESSMENT OF SEA LEVEL RISE FOR COASTAL ZONE MANAGEMENT: VULNERABILITY OF FETHIYE BAY. Msc Thesis. AYSİM DAMLA ATALAY. (2014)
  A.2 EVALUATION OF EXTREME WAVE STATISTICS BY USING TWO WIND DATA SETS FOR WESTERN BLACK SEA REGION IN TURKEY. Msc Thesis. CEVDET ONUR EROL. (2014)
  A.3 EVALUATION OF WAVE STATISTICS BY USING TWO WIND DATA SETS FOR MEDITERRANEAN SEA REGION IN TURKEY. Msc Thesis. ÇAĞRI POLAT. (2015)
  A.4 CALIBRATION AND EVALUATION OF THE THIRD GENERATION WAVE MODELS UNDER EXTREME CONDITIONS IN BLACK SEA BASIN. Msc Thesis. ÇAĞIL KİREZCİ. (2016)
  A.5 EXPERIMENTAL STUDY OF RUBBLE MOUND BREAKWATER PERFORMANCE UNDER TSUNAMI BORES AND SOLITARY WAVES. Msc Thesis. GÖZDE GÜNEY DOĞAN. (2016)
  A.6 A COMPERATIVE ECONOMICAL ANALYSIS ON THE DESIGN OF BERM BREAKWATER: CASE STUDY ON ORDU-GIRESUN AIRPORT BERM BREAKWATER. Msc Thesis. DOĞUKAN ATAK. (2016)
  A.7 SURGE AND COASTAL INUNDATION OF SEPTEMBER 2014 STORM IN GIRESUN, BLACK SEA. Msc Thesis. DENİZ CAN AYDIN. (2016)
  A.8 LONG WAVES GENERATION AND COASTAL AMPLIFICATION DUE TO ATMOSPHERIC PRESSURE DISTURBANCES. Msc Thesis. AYŞE DUHA METİN. (2016)
  A.9 THE POTENTIAL OF OSMOTIC POWER FOR TURKEY. Msc Thesis. AHMET BERKAN KORKMAZ. (2017)

Project Work

  A.1 ASTARTE. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 SEPTEMBER 2013 - 1 SEPTEMBER 2017. Researcher .
  A.2 Assessment, Strategy and Risk Reduction for Tsunamis in Europe. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 NOVEMBER 2013 - 1 JUNE 2017. Researcher .
  A.3 COCONET * Coast to Coast Network of Marine Protected Areas. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 JANUARY 2013 - 1 JANUARY 2016. Researcher .
  A.4 Assessment, Strategy and Risk Reduction for Tsunamis in Europe. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 NOVEMBER 2013 - 1 OCTOBER 2016. Researcher .
  A.5 Assessment, Strategy and Risk Reduction for Tsunamis in Europe. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 NOVEMBER 2013 - 1 OCTOBER 2016. Researcher .
  A.6 Tsunami´ye Karşı İleri Düzey Dayanıklılık İçin Önlem Yapıları Geliştirme Ve Risk Değerlendirme RAPSODİ. Projects funded within the scope of TUBITAK International Academic Support Programs Projects to support the integration to international projects and research networks (1011 etc.) , 1 JULY 2013 - 1 JULY 2015. Researcher .
  A.7 RAPSODI -. Projects funded within the scope of TUBITAK International Academic Support Programs Projects to support the integration to international projects and research networks (1011 etc.) , 1 JULY 2013 - 1 JULY 2015. Researcher .
  A.8 Karadeniz Kıyılarında Deniz Kaynaklı Doğal Afetlerin Modellenmesi için Yeni Araçlar ve Risk Değerlendirmesi. Projects funded within the scope of TUBITAK International Academic Support Programs Projects to support the integration to international projects and research networks (1011 etc.) , 1 JULY 2014 - 1 JULY 2016. Researcher .
  A.9 Karadeniz Kıyılarında Deniz Kaynaklı Doğal Afetlerin Modellenmesi için Yeni araçlar ve risk değerlendirmesi. Projects funded within the scope of TUBITAK International Academic Support Programs Projects to support the integration to international projects and research networks (1011 etc.) , 1 JULY 2014 - 1 JULY 2016. Researcher .
  A.10 İzmir İç Körfezde yaşanan fırtına taşkınlarının araştırılması ve taşkınların önlenmesi için bir öneri: Durgun Dalga Havuzu. BAP-1 BAP-1 , 1 JANUARY 2015 - 1 DECEMBER 2017. Local Coordinator .
  A.11 İzmir İç Körfezde yaşanan fırtına taşkınlarının araştırılması ve taşkınların önlenmesi için bir öneri: Durgun Dalga Havuzu modeli. BAP-1 BAP-1 , 1 JANUARY 2015 - 1 DECEMBER 2016. Local Coordinator .
  A.12 STAR TURZİM A.Ş. PROJESİ. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 APRIL 2015 - 1 JUNE 2015. Local Coordinator .
  A.13 İzmir İç Körfezde yaşanan fırtına taşkınlarının araştırılması ve taşkınların önlenmesi için bir öneri: Durgun Dalga Havuzu modeli. BAP-1 BAP-1 , 1 APRIL 2015 - 1 DECEMBER 2016. Local Coordinator .
  A.14 PINARLAR A.Ş. PROJESİ. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 APRIL 2015 - 1 JUNE 2015. Local Coordinator .
  A.15 İNEBOLU BELEDİYESİ. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JANUARY 2016 - 1 APRIL 2016. Local Coordinator .
  A.16 Probabilistic TSUnami Hazard MAPS for the NEAM Region (TSUMAPS-NEAM). Projects funded within the scope other international institutions Other European Comm. DG for Humanitarian Aid and Civil Protection, 1 JANUARY 2016 - 1 JULY 2017. Researcher .
  A.17 TOROS-HAN RESTAURANT PROJESİ. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JANUARY 2016 - 1 APRIL 2016. Local Coordinator .
  A.18 Training Of Youth for Preparedness Against Marine Induced Hazards. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 JANUARY 2016 - 1 OCTOBER 2018. Researcher .
  A.19 Training Of Youth for Preparedness Against Marine Induced Hazards. Projects funded within the scope other international institutions Other Erasmus+ Cooperation for innovation&the exchange of good pr, 1 JANUARY 2016 - 1 AUGUST 2018. Researcher .
  A.20 ALTA TURİZM PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 OCTOBER 2016. Local Coordinator .
  A.21 YÜKSEL PROJE ULUSLARARASI PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 OCTOBER 2016 - 1 JANUARY 2017. Local Coordinator .
  A.22 HAYAT SAĞLIK A.Ş.PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 OCTOBER 2016. Local Coordinator .
  A.23 YÜKSEL PROJE ULUSLARARASI PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 OCTOBER 2016 - 1 JANUARY 2017. Local Coordinator .
  A.24 AYTUR TURİZM PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 OCTOBER 2016. Local Coordinator .
  A.25 NEHİR-DENİZ ETKİLEŞİMİNDE KISA SÜRELİ SEDİMENT FORM OLUŞUMLARININ DEĞERLENDİRİLMESİ: GEDİZ VE B. MENDERES ÖRNEKLERİ. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 APRIL 2016 - 1 APRIL 2018. Researcher .
  A.26 Rize-Artvin Havalimanı Tahkimat Yapısı Rüzgar ve Dalga İklimi Çalışmaları Projesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JULY 2017 - 1 OCTOBER 2017. Researcher .
  A.27 Rize-Artvin Havalimanı Tahkimat Yapısı Fiziksel Model Deneyleri Projesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 AUGUST 2017 - 1 NOVEMBER 2017. Researcher .
  A.28 Muğla İli, Marmaris İlçesi, Gökova Körfezi, Okluk Koyu Yanaşma İskelesi Rüzgar ve Dalga İklimi Çalışmaları Projesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JULY 2017 - 1 OCTOBER 2017. Researcher .
  A.29 YÜKSEL PROJE. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 FEBRUARY 2017 - 1 MAY 2017. Local Coordinator .
  A.30 Parametric Design for Marine and Coastal Structures. Projects funded within the scope The EU Frameworks Programs Cooperation Projects , 1 SEPTEMBER 2017 - 1 AUGUST 2019. Researcher .
  A.31 Eymir Gölü taşıma kapasitesi ve ziyaretçi yönetim modeli. BAP-1 BAP-1 , 1 AUGUST 2017 - 1 DECEMBER 2017. Local Coordinator .
<< back