Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. RİFAT SÖNMEZ
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  -
Phone :  +90312210 2422
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Civil Eng.
  Master's, Iowa State University, Civil Eng.-const. Management
  Doctorate, Iowa State University, Civil Eng.-const. Management

Research

Thesis Supervised

  A.1 Determination of A Price Index for Escalation of Building Construction Costs in Turkey. Msc Thesis. Kahraman, Serhan. (2005)
  A.2 Determination of Contingency For International Construction Projects During Bidding Stage. Msc Thesis. Ergin, A. Arif. (2005)
  A.3 Conceptual Cost Estimation of Urban Railway System Projects. Msc Thesis. Öntepeli, Mehmet Bahadır. (2005)
  A.4 Perceptions of Turkish Contractors Toward ISO 9001 Quality, ISO 14001 Environmental, and OSHAS 18001 Occupational Health and Safety Management Systems. Msc Thesis. Elif İnce. (2006)
  A.5 A GPS/GIS Based Line of Balance Method for Planning and Control of Construction Projects. Msc Thesis. Furkan Uysal. (2007)
  A.6 Building cost index forecasting with time series analysis. Msc Thesis. Alptekin Kibar. (2007)
  A.7 PARAMETRIC ESTIMATION OF QUANTITIES FOR BUILDING PROJECTS. Msc Thesis. AZİZ HELVACI. (2008)
  A.8 NEURAL NETWORK AND REGRESSION MODELS TO DECIDE WHETHER OR NOT TO BID FOR A TENDER IN OFFSHORE PETROLEUM PLATFORM FABRICATION INDUSTRY. Msc Thesis. BURAK SÖZGEN. (2009)
  A.9 THE RESOURCE ALLOCATION CAPABILITIES OF COMMERCIAL PROJECT MANAGEMENT SOFTWARE PACKAGES FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM. Msc Thesis. KEREM ÇEKMECE. (2009)
  A.10 OPTIMIZATION OF TIME-COST-RESOURCE TRADE-OFF PROBLEMS IN PROJECT SCHEDULING USING META-HEURISTIC ALGORITHMS. Phd Thesis. ÖNDER HALİS BETTEMİR. (2009)
  A.11 PREDICTION OF LITIGATION PROBABILITY FOR INTERNATIONAL CONSTRUCTION PROJECTS DURING BIDDING STAGE. Msc Thesis. İLKAY AYTEN. (2010)
  A.12 A COMPARATIVE STUDY OF REGRESSION ANALYSIS, NEURAL NETWORKS, AND CASE-BASED REASONING FOR EARLY RANGE ESTIMATION OF MASS HOUSING PROJECTS. Msc Thesis. HÜSEYİN KARANCI. (2010)
  A.13 A BRANCH AND BOUND ALGORITHM FOR RESOURCE LEVELING PROBLEM. Msc Thesis. MUSTAFA ÇAĞDAŞ MUTLU. (2010)
  A.14 CAS FLOW ANALYSIS OF CONSTRUCTION PROJECTS USING FUZZY SET THEORY. Msc Thesis. SERHAT MELİK. (2010)
  A.15 OPTIMIZATION OF RESOURCE LEVELING PROBLEM USING GENETIC ALGORITHMS WITH SIMULATED ANNEALING. Msc Thesis. ERDEM ÖZLEYEN. (2011)
  A.16 STOCHASTIC FEASIBILITY ANALYSIS OF GREEN BUILDINGS. Msc Thesis. HANDAN GÜNDOĞAN. (2012)
  A.17 CONCEPTUAL QUANTITY MODELING OF SINGLE SPAN HIGHWAY BRIDGES BY REGRESSION, NEURAL NETWORKS AND CASE BASED REASONING METHODS. Msc Thesis. MERT AŞIKGİL. (2012)
  A.18 DEVELOPMENT OF HIGH PERFORMANCE EXACT ALGORITHMS FOR RESOURCE LEVELING PROBLEM IN CONSTRUCTION PROJECTS. Msc Thesis. HÜSEYİN YENİOCAK. (2013)
  A.19 AN EXACT ALGORITHM FOR OPTIMIZATION OF DISCRETE TIME-COST TRADE-OFF PROBLEM. Msc Thesis. SAMAN AMINBAKHSH. (2013)
  A.20 THE RESOURCE ALLOCATION CAPABILITIES OF COMMERCIAL CONSTRUCTION PROJECT MANAGEMENT SOFTWARE FOR THE RESOURCE LEVELING PROBLEM. Msc Thesis. EMAD REZVAN KHAH. (2014)
  A.21 A CONSTRAINT PROGRAMMING METHOD FOR DISCRETE TIME-COST TRADE-OFF PROBLEM. Msc Thesis. İSMET BERKİ YOLASIĞMAZ. (2015)
  A.22 COST, SCHEDULE, RESOURCE OPTIMIZATION OF LARGE SIZE PROJECTS USING GPU ACCELERATED ALGORITHMS.. Msc Thesis. MUSTAFA GÜREL. (2015)
  A.23 CONTRACT AND CLAIM MANAGEMENT. Msc Thesis. NİZAMİ ÖZÇELİK. (2015)
  A.24 A MIXED LINEAR INTEGER MODEL FOR MILITARY FACILITY LAYOUT OPTIMIZATION PROBLEM. Msc Thesis. HÜSEYİN BAHADIR ECE. (2015)
  A.25 A MIXED INTEGER PROGRAMMING METHOD FOR PARETO FRONT OPTIMIZATION OF DISCRETE TIME COST TRADE-OFF PROBLEM. Msc Thesis. MERT BİLİR. (2015)
  A.26 DEVELOPMENT OF HIGH PERFORMANCE HEURISTIC AND META-HEURISTIC MEHODS FOR RESOURCE OPTIMIZATION OF LARGE SCALE CONSTRUCTION PROJECTS. Phd Thesis. MAHDI ABBASI IRANAGH. (2015)
  A.27 A MIXED INTEGER PROGRAMMING METHOD FOR INTEGRATED DISCRETE TIME-COST TRADE-OFF AND MANPOWER RESOURCE LEVELING PROBLEM. Msc Thesis. ALİ CAN TATAR. (2016)
  A.28 A MULTI-CRITERIA DECISION SUPPORT SYSTEM FOR OPTIMAL ALLOCATION OF SUBCONTRACTORS IN CONSTRUCTION PROJECTS. Msc Thesis. SEMİH AKKERMAN. (2016)

Project Work

  A.1 Üst-Sezgisel Yöntemlerle Kısıtlı Kaynaklı Birden Fazla Proje için İş Programı Hazırlanması. BAP-1 (Excluding thesis supports) , 1 MARCH 2010 - 1 DECEMBER 2010. Local Coordinator .
  A.2 Üst-Sezgisel yöntemlerle kısıtlı kaynaklı birden fazla proje için iş programı hazırlanması.. BAP-1 (Excluding thesis supports) , 1 JANUARY 2010 - 1 DECEMBER 2011. Local Coordinator .
  A.3 İnşaat Yapım Projelerinde Kaynak Dengeleme Problemi Için Yüksek Performanslı Kesin Ve Üst-Sezgisel Yöntemler Geliştirilmesi. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 OCTOBER 2011 - 1 APRIL 2014. National Coordinator .
  A.4 İnşaat Yapım Projelerinde Kaynak Dengeleme Problemi Için Yüksek Performanslı Kesin Ve Üst-Sezgisel Yöntemler Geliştirilmesi. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 OCTOBER 2011 - 1 APRIL 2014. Local Coordinator .
  A.5 İnşaat Yapım Projelerinde Kaynak Dengeleme Problemi Için Yüksek Performanslı Kesin Ve Üst-Sezgisel Yöntemler Geliştirilmesi. TUBİTAK Projects , 1 OCTOBER 2011 - 1 APRIL 2014. Local Coordinator .
  A.6 İnşaat Yapım Projelerinde Kesikli Zaman Maliyet Ödünleşim Probleminin Çözümü Için Etkin Bir Memetik Yöntem Geliştirilmesi. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 MARCH 2014 - 1 MARCH 2016. National Coordinator .
  A.7   İnşaat Yapım Projelerinde Kesikli Zaman Maliyet Ödünleşim Probleminin Çözümü Için Etkin Bir Memetik Yöntem Geliştirilmesi. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 MARCH 2014 - 1 MARCH 2016. National Coordinator .
  A.8 İnşaat Yapım Projelerinde Kesikli Zaman Maliyet Ödünleşim Probleminin Çözümü Için Etkin Bir Memetik Yöntem Geliştirilmesi. Projects funded within the scope of TUBITAK National Academic Support Programs Scientific and Technological Research Projects (3501, 1001 etc.) , 1 MARCH 2014 - 1 MARCH 2016. Local Coordinator .
<< back