Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. AYŞEN ERGİN (RETIRED)
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  -
Phone :  +90312210 2401
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Civil Eng.
  Bachelor's, Middle East Technical University, Civil Eng.
  Master's, Middle East Technical University, Civil Eng.
  Doctorate, Middle East Technical University, Civil Eng.

Research

Thesis Supervised

  A.1 A 3-D Experimental Study on the Stability Coefficients for Breakwaters Armoured With Concrete Cubes. Msc Thesis. Cenk Armağan. (1998)
  A.2 A 3D Experimental Study on the Stability Coefficients for Breakwaters Armored with Antifer Blocks Under Non-Breaking Wave Conditions. Msc Thesis. İ. Çağlar Kahyaoğlu. (1998)
  A.3 Port Optimization. Msc Thesis. Yenel Kabakçı. (1998)
  A.4 A 3D Experimental Study on the Stability Coefficients for Breakwaters Armored with Antifer Blocks under Breaking Wave Conditions. Msc Thesis. Hakan Yüncü. (1998)
  A.5 A Reliability Based Risk Assesment Model. Phd Thesis. Can Elmar Balas. (1998)
  A.6 Comparison of Stability of Two and Three Layers Antifer Armoured Breakwaters. Msc Thesis. Orkun Pulular. (1999)
  A.7 Transmission of Waves Through the Breakwaters Constructed with Geotextile Units. Msc Thesis. Asur Barış Derun. (1999)
  A.8 Transmission of Waves Through the Breakwaters Constructed with Geotextile Units. Msc Thesis. Salim Pamukçu. (1999)
  A.9 Comparison of Two Different Placement Patterns of Tetrapod Armoured Breakwaters. Msc Thesis. Bülent Karakaş. (1999)
  A.10 A Comparitive Study on the Reliability-Based Risk Assessment in Project Management of Coastal Structures. Msc Thesis. Gökhan Pişkin. (2000)
  A.11 Risk Assessment of Vertical Wall Breakwaters using Sliding and Overturning Design Criteria. Msc Thesis. Deniz Keskin. (2000)
  A.12 A Statistical Litter Assessment and Beach Grading Survey at Selected Beaches. Msc Thesis. Deniz Demirci. (2001)
  A.13 Risk Assessment of Vertical Wall Breakwaters Using Sliding and Overturning Design Criteria for Breaking Waves. Msc Thesis. Fırat İçmeli. (2001)
  A.14 A study for the development of sceismic Design specifications for coastal structures. Msc Thesis. Erdem Gözpınar. (2003)
  A.15 An Economical Analysis of alternative eastern black sea coastal highway defense structures. Msc Thesis. İnanç Taşkıran. (2003)
  A.16 An experimental study on the stability of eastern black sea coastal highway defense structures. Msc Thesis. M. Rıfat Dedeoğlu. (2003)
  A.17 Risk and cost analysis in coastal structures. Msc Thesis. Murat Alimoğlu. (2003)
  A.18 Evaluation of coastal scenic assesment parameters : pilot study for selected coastal area Antalya/Konyaaltı beach. Msc Thesis. Deniz Çakır. (2004)
  A.19 Effect of Wave Grouping, Spectral Shape and Extreme Waves in a Wave Train on the Stability of Rubble Mound Breakwaters. Phd Thesis. Bergüzar Öztunalı Özbahçeci. (2004)
  A.20 Coastal Scenic Assesment Using Fuzzy Logic Approach. Msc Thesis. Selami Tansel Karakaya. (2004)
  A.21 Coastal Scenic Evaluation by Application of Fuzzy Logic Mathemetics. Msc Thesis. Barış Uçar. (2004)
  A.22 Coastal scenic Evaluation, A Pilot Study for Çıralı. Msc Thesis. Evrim Gezer. (2004)
  A.23 A Case Study on the Stability of Berm Type Coastal Defense Structures. Msc Thesis. Gökçe Fışkın. (2004)
  A.24 A Case Study on the Stability of Berm Type Coastal Defense Structures. Msc Thesis. Başar Özler. (2004)
  A.25 Neural network prediction of tsunami parameters in the aegean and Marmara Seas. Msc Thesis. Muammer Sercan Erdurmaz. (2004)
  A.26 An Assessment of Processes&Strategies for Management of the Penarth Coast. Phd Thesis. M.R.Phillips. (2005)
  A.27 A One-Line Numerical Model For Shoreline Evolution Under The Interaction of Wind Waves and Offshore Breakwaters. Msc Thesis. Artagan, S. S.. (2006)
  A.28 Numerical Modeling of Longshore Sediment Transport. Msc Thesis. Safak I.. (2006)
  A.29 Numerical Modeling of Wave Diffraction in One-Dimensional Shoreline Change Model. Msc Thesis. Baykal, C.. (2006)
  A.30 An Implicit One-Line Numerical Model on Longshore Sediment Transport. Msc Thesis. Esen, Mustafa. (2007)
  A.31 New Seismic Design Approaches to Block Type Quay Walls. Msc Thesis. Karakuş, Hülya. (2007)
  A.32 Vulnerability of Coastal Areas to Sea Level Rise. Msc Thesis. Özyurt, Gülizar. (2007)
  A.33 A COMPUTER MODEL FOR THE TRANSFORMATION OF IRREGULAR WAVES. Msc Thesis. SERHAN ALDOĞAN. (2008)
  A.34 AN EXPERIMENTAL STUDY ON THE PERFORMANCE OF BOX TYPE FLOATING BREAKWATERS WITH SCREENS. Msc Thesis. MUSTAFA ONUR KÜRÜM. (2008)
  A.35 DEVELOPMENT OF A STABILITY ANALYSIS PROGRAM FOR BLOCK TYPE QUAY WALLS AND COMPARISON OF BLOCK PLACING METHODS. Msc Thesis. Cengiz Nergiz. (2009)
  A.36 RELIABILITY-BASED DESIGN MODEL FOR RUBBLE-MOUND COASTAL DEFENCE STRUCTURES. Phd Thesis. Gökçe Arıkan. (2009)
  A.37 RELIABILITY-BASED DESIGN MODEL FOR RUBBLE-MOUND COASTAL DEFENCE STRUCTURES. Phd Thesis. GÖKÇE ARIKAN. (2010)
  A.38 DEVELOPMENT OF A STABILITY ANALYSIS PROGRAM FOR BLOCK TYPE QUAY WALLS AND COMPARISON OF BLOCK PLACING METHODS . Msc Thesis. CENGİZ NERGİZ. (2010)
  A.39 FUZZY VULNERABILITY ASSESSMENT MODEL OF COASTAL AREAS TO SEA LEVEL RISE. Phd Thesis. GÜLİZAR ÖZYURT. (2010)

Project Work

  A.1 Coastal Scenic Assessment at Selected Areas: Turkey, UK, Malta. The British Council, 1 OCTOBER 1999 - 1 OCTOBER 2002. Coordinator .
  A.2 Harçla Dol. Geotekstil Tüpler Kulla. İnşa Ed. D.K. Tas.Es.ve Yontem.Duzenli Dalga Kosulları Altında Aras.. AFP, 1 MAY 1999 - 1 APRIL 2000. Coordinator .
  A.3 Kıyı Bölgeleri Su Basma Alanlarının CBS ve UA Teknikleriyle Belirlenmesi. TÜBİTAK (Nat. Sc. & Tech. Foundation), 1 JANUARY 1999 - 1 DECEMBER 1999. Researcher .
  A.4 Harçla Doldurulmuş Geotekstil Tüpler Kullanılarak İnşaa Edilen Dalgakıranların Tasarım Esas. ve Yöntem.. Research Fund, 1 MAY 1999 - 1 MAY 2000. Coordinator .
  A.5 Coastal Scenic Assessment at Selected Areas;TURKEY,UK,MALTA. British Council, 1 MARCH 2000 - 1 JUNE 2003. Coordinator .
  A.6 Development of a Reliability-Based Design Standard for the Preliminary Design of Coastal Structures. TÜBİTAK, 1 AUGUST 2000 - . Researcher .
  A.7 Coastal Scenic Assessment at Selected Areas: Turkey, UK, Malta. The British Council, 1 JANUARY 2001 - 1 DECEMBER 2001. Coordinator .
  A.8 Bulanık Mantık Yöntemi ile Kıyı Alanları Doğal Yapı ve Kullanım Değerlendirmesi. AFP, 1 JUNE 2001 - 1 MAY 2002. Coordinator .
  A.9 Coastal Scenic Assessment at Selected Areas: Turkey,UK,Malta. The British Council, 1 MARCH 2001 - 1 JULY 2003. Coordinator .
  A.10 Bulanık Mantık Yöntemi ile Kıyı Alanları Doğal Yapı ve Kullanım Değerlendirmesi. AFP, 1 MARCH 2001 - 1 DECEMBER 2001. Coordinator .
  A.11 Development of a Reliability-Based Design Standard for the Preliminary Design of Coastal Structures. TÜBİTAK, - . Researcher .
  A.12 Dogal Afetler Riskine Maruz Kıyı Yapıları için Güvenirliğe Dayalı Risk Değerlendirilmesi Modeli. DPT, 1 JUNE 2002 - 1 MAY 2004. Coordinator .
  A.13 İskenderun Organize Sanayi Bölgesi Deniz ve Kara Ulaşım Sistemi Planlama Projesi. İskenderun Organize Sanayi Bölgesi Müdürlüğü, 1 MARCH 2002 - 1 JULY 2002. Researcher .
  A.14 Dogal Afet Riskine Maruz Kiyi Yapilari icin Guvenirlige Dayali Rirk Degerlendirme Modeli. BAP-03-03 DPT 2002 K 120540-06, 1 JUNE 2002 - 1 JUNE 2003. Coordinator .
  A.15 Development of a Reliability Model for the Preliminary Design of Coastal Structures. TÜBİTAK, - . Researcher .
  A.16 Coastal Scenic Evaluation at selected site: Çıralı. British Council, 1 NOVEMBER 2003 - . Coordinator .
  A.17 Coastal Scenic Evaluation. A pilot study of some Dalmatian areas. WWF/MedPO (Roma), 1 JANUARY 2003 - 1 APRIL 2003. Researcher .
  A.18 Coastal Scenic Evaluation of Top Scenic Sites on the Island of Gozo, Malta. Malta Tourism Association, 1 JULY 2003 - . Researcher .
  A.19 Navene Yatch Harbor,Italy:Model Investigations. Sistema Walcon (Italy), - . Researcher .
  A.20 A New methodology for Evaluating Coastal Scenery:Fuzzy Logic Systems –A pilot Study for Cirali. British Council, - . Coordinator .
  A.21 Side Perissia Otel Önü Kıyı Koruma Projesi. Side Perissia Otel, 1 MAY 2005 - 1 DECEMBER 2006. Researcher .
  A.22 Model Investigations of Navene Yacht Harbor in Lake Garda, Italy. Sistema Walcon, Italy, - . Coordinator .
  A.23 Wave Characteristics of Coastal Protection Structures of Üsküdar Station of MARMARAY Project. SU-YAPI Mühendislik Müşavirlik A.Ş., 1 MARCH 2005 - 1 APRIL 2005. Coordinator .
  A.24 Tsunami Risk and Stratejies for European Region. EU , 1 OCTOBER 2006 - 1 OCTOBER 2009. Researcher .
  A.25 BAB-2006, Turgutreis Beldesinin tarihi, kültürel kaynaklarının ve doğal kıyı yapısının değerlendirilmesi. METU, 1 MARCH 2006 - 1 APRIL 2007. Coordinator .
  A.26 Turgutreis (Bodrum) Assessment of Historical, Cultural and Coastal Scenic Values of Turgutreis (Bodrum). BAP-2(DPT) (Excluding OYP and other Projects coordinated by President’s office) , - 1 DECEMBER 2008. Local Coordinator .
  A.27 Tsunami Risk and Stratejies for European Region. EU , 1 OCTOBER 2006 - 1 OCTOBER 2009. Researcher .
  A.28 Tsunami Risk and Strategies for European Region. EU , 1 OCTOBER 2006 - 1 APRIL 2009. Researcher .
  A.29 Kıyı Yapıları ve Limanlar Planlama ve Tasarım Teknik Esasları. DLH, Bayındırlık ve İskan Bakanlığı, 1 MARCH 2006 - 1 MARCH 2007. Researcher .
  A.30 DEFRA Project on Climate Change. British Government, 1 MARCH 2006 - 1 MARCH 2007. Coordinator .
  A.31 Fethiye –Gocek Specially Protected Area;Assessment of the Boat Carrying Capacity of the Gocek Bay. DSİM Projects , 1 MAY 2007 - 1 DECEMBER 2007. Researcher .
  A.32 Adaptive Management Strategies for Climate Change & Global Warming at Selected Coastal Areas in Turkey. OTHER INTERNATIONAL AGENCIES DEFRA, - 1 APRIL 2008. International Coordinator .
  A.33 Alanya Fuğla Kıyı Düzenleme Projesi. DSİM Projects , 1 OCTOBER 2008 - 1 APRIL 2009. Researcher .
  A.34 Kıyılarda İklim Değişikliğine Karşı Kumlanma Modeli Destekli Kırılganlık Analizi Projesi - Kideka. TUBİTAK Projects , 1 MARCH 2009 - 1 MARCH 2012. Local Coordinator .
  A.35 Sinop Nukleer Teknoloji Merkezi Tsunami ve Taşkın Analizleri Araştırma Projesi. DSİM Projects , 1 MAY 2009 - 1 NOVEMBER 2009. Researcher .
  A.36 Kıyılarda İklim Değişikliğine Karşı Kumlanma Modeli Destekli Kırılganlık Analizi Projesi - Kideka. TUBİTAK Projects , 1 MARCH 2009 - 1 MARCH 2012. Local Coordinator .
  A.37 TAISEI CORP. PROJESİ. DSİM Projects , 1 APRIL 2009 - 1 MAY 2009. Local Coordinator .
  A.38 Erzin Bolgesi (İskenderun Korfezi) Dalga Ikliminin elde edilmesi ve Afet Analizleri Araştırma Projesi. DSİM Projects , 1 JUNE 2009 - 1 OCTOBER 2009. Researcher .

Consultancy and Expert Reports

  A.1 Istanbul Ili Hudutlari Dahilinde Bati Kardeniz Sahilinde Denizden Kum Alimi. İstanbul Valiliği, (11.2003)
  A.2 Çıralı (Ulupınar) Kıyı Alanı Doğal Yapı ve İnsan Kullanımı Değerlendirmesi. Kemer Belediyesi, Muğla, (.2004)
  A.3 Turgutreis Beldesi Kıyı ve Kara Alanları Değerlendirme Raporu. Turgutreis Belediyesi, (11.2005)
<< back