Prof.Dr. İREM DİKMEN TOKER
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  http://prrg.ce.metu.edu.tr/
Phone :  +90312210 2470
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Civil Engineering
  Master's, Middle East Technical University, Civil Eng.-const. Management
  Doctorate, Middle East Technical University, Civil Eng.-const. Management

Publications (INTERNATIONAL)

Journal Papers

  A.1 Özdoğan (Dikmen), İ. and Birgönül, M.T., A Decision Support Framework for Project Sponsors in the Planning Stage of Build-Operate-Transfer (BOT) Projects. "Journal of Construction Management and Economics", 18, (2000), p.343-353.
  A.2 Irem Dikmen and M. Talat Birgonul, Strategic Perspective of Turkish Construction Companies. "ASCE Journal of Management in Engineering", 19, (2003), p.33-40.
  A.3 Irem Dikmen and M.Talat Birgönül, Neural network model to support international market entry decisions. "ASCE Journal of Construction Engineering and Management", 130, (2004), p.59-66.
  A.4 Dikmen, I., Birgonul, M.T. and Kiziltas, S., Strategic Use of Quality Function Deployment (QFD) in the Construction Industry. "Building and Environment", 40, (2005), p.245-255.
  A.5 Ozorhon, B., Dikmen, I. and Birgonul, M.T., Organizational Memory Formation and Its Use in Construction. "Building Research and Information", 33, (2005), p.67-79.
  A.6 Dikmen, I., Birgonul, M.T. and Artuk, U. S., Integrated framework to investigate value innovations. "ASCE Journal of Management in Engineering", 21, (2005), p.81-90.
  A.7 Dikmen, I., Birgonul, M.T. and Ozcenk, I., Marketing Orientation in Construction Firms: Evidence from Turkish Contractors. "Building and Environment", 40, (2005), p.257-265.
  A.8 Dikmen, I., Birgonul, M.T. and Kiziltas, S., Prediction of Organizational Effectiveness in Construction Companies. "ASCE Journal of Construction Engineering and Management", 131, (2005), p.252-261.
  A.9 Dikmen, I. and Birgonul, M.T., A Review of International Construction Research: Ranko Bon’s Contribution. "Construction Management and Economics", 24, (2006), p.725-733.
  A.10 Arslan, G., Tuncan, M., Birgonul, M.T. and Dikmen, I., E-Bidding Proposal Preparation System for Construction Projects. "Building and Environment", 41, (2006), p.1406-1413.
  A.11 Dikmen, I. and Birgonul, M.T., An Analytical Hierarchy Process Based Model for Risk and Opportunity Assessment of International Construction Projects. "Canadian Journal of Civil Engineering", 33, (2006), p.58-68.
  A.12 Ozorhon, B., Dikmen, I. and Birgonul, M.T., A Case-Based Reasoning Model for International Market Selection. "ASCE Journal of Construction Engineering and Management", 132, (2006), p.940-948.
  A.13 Ozorhon, B., Dikmen, I. and Birgonul, M.T., Using Analytical Network Process to Predict the Performance of International Construction Joint Ventures. "Journal of Management in Engineering", 23, (2007), p.156-163.
  A.14 Dikmen, I., Birgonul, M.T. and Ozorhon, B., Project Appraisal and Selection Using the Analytical Network Process. "Canadian Journal of Civil Engineering", 34, (2007), p.786-792.
  A.15 Dikmen, I., Birgonul, M.T. and Han, S., Risk Assessment of International Construction Projects. "International Journal of Project Management", 25, (2007), p.494-505.
  A.16 Dikmen, I., Birgonul, M.T. and Gur, A.K., A Case-Based Decision Support Tool for Bid Mark-up Estimation of International Construction Projects. "Automation in Construction", 17, (2007), p.30-44.
  A.17 Ozorhon, B., Arditi, D., Dikmen, I. and Birgonul, M.T., Effect of Host Country and Project Conditions in International Construction Joint Ventures. "International Journal of Project Management", 25, (2007), p.799-806.
  A.18 Kivrak, S., Arslan, G., Dikmen, I. and Birgonul, M.T, Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors. "Journal of Management in Engineering", 24, (2008), p.87-95.
  A.19 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M.T., The Role of Organisational Culture in Construction Company Alliances. "International Journal of Human Resources Development and Management", 8, (2008), p.177-191.
  A.20 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M.T, Effect of Partner Fit in International Construction Joint Ventures. "Journal of Management in Engineering", 24, (2008), p.12-20.
  A.21 Arslan, G., Kivrak, S., Birgonul, M.T., and Dikmen, I., Improving Sub-contractor Selection Process in Construction Projects: Web-based Sub-contractor Evaluation System (WEBSES). "Automation in Construction", 17, (2008), p.480-488.
  A.22 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M.T, Implications of Culture in the Performance of International Construction Joint Ventures. "Journal of Construction Engineering and Management", 134, (2008), p.361-370.
  A.23 Dikmen, I., Birgonul M.T., Anac, C., Tah, J.H.M. and Aouad, G., Learning From Risks: A Tool for Post-project Risk Assessment. "Automation in Construction", 18, (2008), p.42-50.
  A.24 Dikmen, I., Birgonul, M.T., and Fidan, G., A Risk and Vulnerability Ontology for Construction Projects. "International Journal of Engineering and Management", 1, (2009), p.63-70.
  A.25 Bu-Qammaz, A.S., Dikmen, I., and Birgonul, M.T., Risk Assessment of International Construction Projects Using the Analytic Network Process. "Canadian Journal of Civil Engineering", 36, (2009), p.1170-1181.
  A.26 Isik, Z., Arditi, D., Dikmen, I., and Birgonul, M.T., Impact of Corporate Strengths/weaknesses on Project Management Competencies. "International Journal of Project Management", 27, (2009), p.629-637.
  A.27 Dikmen, I., Birgonul, M. T., and Budayan, C., Strategic Group Analysis in the Construction Industry. "ASCE Journal of Construction Engineering and Management", 135, (2009), p.288-297.
  A.28 Budayan, C., Dikmen, İ., and Birgonul, M.T., Comparing the Performance of Traditional Cluster Analysis, Self-Organizing Maps and Fuzzy C-Means Method for Strategic Grouping. "Expert Systems with Applications", 36, (2009), p.11772-11781.
  A.29 Isik, Z., Arditi, D., Dikmen, I., and Birgonul, M.T, Impact of Resources and Strategies on Construction Company Performance. "ASCE Journal of Management in Engineering", 26, (2010), p.9-18.
  A.30 Dikmen, I., Birgonul, M.T., Ozorhon, B., and Egilmezer Sapci, N., Using Analytic Network Process to Assess Business Failure Risks of Construction Firms. "Engineering, Construction and Architectural Management", 17, (2010), p.369-386.
  A.31 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M.T., Performance of International Joint Ventures in Construction. "ASCE Journal of Management in Engineering", 26, (2010), p.209-222.
  A.32 Isik, Z., Arditi, D., Dikmen, I., and Birgonul, M.T, The Role of Exogenous Factors in the Strategic Performance of Construction Companies. "Engineering, Construction and Architectural Management", 17, (2010), p.119-134.
  A.33 Eybpoosh, M., Dikmen, I., and Birgonul, M.T., Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. "Journal of Construction Engineering and Management", 137, (2011), p.1164-1175.
  A.34 Fidan, G., Dikmen, I., Tanyer, A. M., and Birgonul, M.T., Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects. "Journal of Computing in Civil Engineering", 25, (2011), p.302-315.
  A.35 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M.T., Toward a Multidimensional Performance Measure for International Joint Ventures in Construction. "Journal of Construction Engineering and Management", 137, (2011), p.403-411.
  A.36 Soibelman,L., Sacks,R., Akinci, B., Dikmen, I., Birgonul, M.T., and Eybpoosh, M., Preparing Civil Engineers for International Collaboration in Construction Management. "Journal of Professional Issues in Engineering Education and Practice", 137, (2011), p.141-150.
  A.37 Budayan, C., Dikmen, İ., and Birgonul, M.T., Hybrid Strategic Groups in Construction. "Engineering Project Organization Journal", 1, (2011), p.183-196.
  A.38 Ozcan, G., Dikmen, I., and Birgonul, M.T., Assessment of Risk Paths in Construction Projects. "International Journal of Project Organisation and Management", 3, (2011), p.316-334.
  A.39 Dikmen, I., Birgonul, M.T., Tah, J.H.M., and Ozer, A.H., A Web-Based Risk Assessment Tool Using Integrated Duration – Cost Influence Network Model. "ASCE Journal of Construction Engineering and Management", 138, (2012), p.1023-1034.
  A.40 Karakas, K., Dikmen, I., and Birgonul, M.T., Multiagent System to Simulate Risk-Allocation and Cost-Sharing Processes in Construction Projects. "ASCE Journal of Computing in Civil Engineering", 27, (2013), p.307-319.
  A.41 Budayan, C., Dikmen, I., and Birgonul, M.T., Investigation of Drivers and Modes of Differentiation in Turkish Construction Industry. "Engineering, Construction and Architectural Management", 20, (2013), p.345-364.
  A.42 Yildiz, A.E., Dikmen, I., Birgonul, M.T., Ercoskun, K., and Alten, S., A Knowledge-Based Risk Mapping Tool for Cost Estimation of International Construction Projects. "Automation in Construction", 43, (2014), p.144-155.
  A.43 Budayan, C., Dikmen, I. and Birgonul, M.T., Alignment of Project Management with Business Strategy in Construction: Evidence from the Turkish Contractors. "Journal of Civil Engineering and Management", 21, (2015), p.94-106.
  A.44 Birgonul, M.T., Dikmen, I. and Bektas, S., An Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices. "ASCE Journal of Construction Engineering and Management", 141, (2015).
  A.45 M. Talat Birgönül, İrem Dİkmen Toker, Cenk Budayan, Tuncay Demirel, An expert system for the quantification of fault rates in construction fall accidents. "International Journal of Occupational Safety and Ergonomics", 22, (2016), p.20-31.
  A.46 Emre Caner Akcay, Irem Dikmen, M. Talat Birgönül, David Arditi, Estimating the Profitability of Hydropower Investments With a Case Study From Turkey. "Journal of Civil Engineering and Management", 23, (2017), p.1002–1012.
  A.47 Bartug Kemal Akgul, Beliz Ozorhon, Irem Dikmen, M. Talat Birgönül, Social Network Analysis of Construction Companies Operating in International Markets: Case of Turkish Contractors. "Journal of Civil Engineering and Management", 23, (2017).
  A.48 Huseyin Erol, Irem Dikmen, M. Talat Birgönül, Measuring the Impact of Lean Construction Practices on Project Duration and Variability: A Simulation-based Study on Residential Building. "Journal of Civil Engineering and Management", 23, (2017), p.241–251.
 

Conference Papers

  A.1 Birgönül, T. and Özdoğan (Dikmen), İ., Competitiveness of Turkish Contractors in International Markets. "Association of Researchers in Construction Management (ARCOM) 16th Annual Conference", 1, (2000), p.95-104.
  A.2 Birgönül, T. and Özdoğan (Dikmen), İ., İşveren Kaynaklı Hızlandırmanın Süre ve Maliyet Analizi. "4th International Congress on Advances in Civil Engineering", 4, (2000), p.1455-1466.
  A.3 Özdoğan (Dikmen), İ. and Birgönül, M.T., Diversification Strategies of Turkish Construction Companies. "CIB World Building Congress 2001", 1, (2001).
  A.4 Birgönül, M.T. and Özdoğan (Dikmen), İ., Risks Borne by Foreign Contractors Doing Business in Turkey. "17th Annual Conference of Association of Researchers in Construction Management (ARCOM)", 2, (2001), p.845-853.
  A.5 Dikmen, İ. and Birgönül, M.T., An Investigation of the Factors that Affect International Market Entry Decisions. "RICS Foundation Construction and Building Research Conference (COBRA)", 1, (2002), p.232-242.
  A.6 Birgönül, M.T., Dikmen, İ. and Ataoğlu, T., Organisational Learning as a Performance Driver in Construction Companies. "18th Annual conference of Association of Researchers in Construction Management (ARCOM)", 2, (2002), p.647-656.
  A.7 Birgönül, M.T., Dikmen, İ. and Kızıltaş, S., Application of Quality Function Deployment (QFD) Methodology to Housing Projects. "5th International Congress on Advances in Civil Engineering", 2, (2002), p.1299-1308.
  A.8 Dikmen, İ., Birgönül, M.T. and Artuk, U., Türk İnşaat Sektöründe İnsan Kaynakları Yönetimi. "5th International Congress on Advances in Civil Engineering", (2002), p.325-334.
  A.9 Birgönül, M.T., Dikmen, İ. and Ataoğlu, T., Ortak Girişimlerde Kritik Başarı Faktörleri. "5th International Congress on Advances in Civil Engineering", (2002), p.335-344.
  A.10 Semiha Kiziltas, Irem Dikmen and M. Talat Birgonul, Organisational effectiveness in construction: A conceptual framework. "19th ARCOM (Association of Researchers in Construction Management) Conference", 2, (2003), p.523-532.
  A.11 Irem Dikmen, M. Talat Birgonul and Umut Artuk, Innovation in construction: Evidence from Turkey. "Proceedings of the Joint Int. Symposium of CIB Working Commissions W55,W65 and W107", 2, (2003), p.396-407.
  A.12 M.Talat Birgönül, İrem Dikmen, Semiha Kızıltaş and Umut Artuk, Organizational effectiveness in construction companies: A conceptual framework. "Sixth International Conference on Advances in Civil Engineering", 3, (2004), p.1931-1940.
  A.13 Ebru Çanga, M.Talat Birgönül and İrem Dikmen, The impact of graduate construction management education on professional life. "4th Global Congress on Engineering Education", (2004), p.151-154.
  A.14 M.Talat Birgönül, İrem Dikmen and Beliz Özorhon, Case-based reasoning applications in construction management. "Sixth International Conference on Advances in Civil Engineering", 3, (2004), p.1941-1950.
  A.15 İrem Dikmen and M.Talat Birgönül, Impact of strategic planning on competitive advantage. "ASCE Speciality Conference on Leadership and Management in Construction", (2004), p.200-210.
  A.16 İrem Dikmen, M.Talat Birgönül and A.Erdem Arıkan, A critical review of risk management support tools. "ARCOM Twentieth Annual Conference", 2, (2004), p.1145-1154.
  A.17 Birgonul, M.T., Dikmen, İ. and Demirel, T., Decision support tool for the quantification of fault rates in construction fall accidents. "ARCOM 2005 (Association of Researchers in Construction Management)", 2, (2005), p.1027-1036.
  A.18 Ozorhon, B. Dikmen, İ. and Birgonul, M. T., A case-based reasoning model as an organizational learning tool. "CIB Symposium", 7, (2005), p.183-193.
  A.19 Isik, Z., Dikmen, I. and Birgonul, M. T., Critical Review of Performance Measurement Systems in the Construction Industry. "7th International Congress on Advances in Civil Engineering", (2006).
  A.20 Dikmen, I., Birgonul, M.T. and Arikan, A.E., Application of an Integrated Risk Management System (IRMS) to an International Construction Project. "Association of Researchers in Construction Management 2006", 1, (2006), p.153-163.
  A.21 Ozorhon, B., Dikmen, I. and Birgonul, M.T., International Market Entry Decisions: A Knowledge-Based Approach. "1st International CIB Endorsed METU Postgraduate Conference", 1, (2006), p.377-387.
  A.22 Ozorhon, B., Dikmen, I. and Birgonul, M. T., Performance Indicators for International Joint Ventures: State of Knowledge. "CIB Joint International Symposium", (2006).
  A.23 Bu-Qammaz A.,Dikmen I., Birgonul M.T., Cultural Risk Assessment In Construction Projects. "International Conference on Construction Culture, Innovation and Management", (2006), p.157-167.
  A.24 Dikmen, I. and Birgonul, M. T., A Review of Frameworks for Analyzing International Construction. "ASCE and CIB 2nd Speciality Conference on Leadership and Management in Construction and Engineering", 1, (2006), p.409-417.
  A.25 Ahmet Turer, Irem Dikmen, Burcu Altan-Sakarya, K. Önder Cetin, ABET accreditation preparations: an innovative self-evaluation matrix method. "International Workshop on Reforming Civil and Environmental Engineering Education", (2006).
  A.26 Dikmen I., Birgonul M.T. and Atasoy, G., Using Cognitive Maps for Risk Modelling in Construction Projects. "CME 25 Conference, Construction Management and Economics 'Past, Present and Future'", (2007).
  A.27 Budayan C., Dikmen I. and Birgonul, M.T., Strategic Group Analysis by Using Self Organizing Maps. "ARCOM 2007", 1, (2007), p.223-232.
  A.28 Isik Z, Dikmen I. and Birgonul, M.T., Using Analytical Network Process (ANP) for Performance Measurement in Construction. "The Royal Institution of Chartered Surveyors, Proceedings of the COBRA 2007 Conference", (2007).
  A.29 Dikmen I., Birgonul M.T., Tah, J.H.M. and Aouad, G., A Learning Based Approach for Risk Management. "1st Symposium on Towards the Foundation of Theory for the Built Environment", 1, (2007), p.21-35.
  A.30 Dikmen, I., Birgonul, M.T., and Fidan, G., Assessment of project vulnerability as a part of risk management in construction. "Procs. of Joint 2008 CIB W065/W055 Symposium", (2008).
  A.31 Dikmen, I., Birgonul M.T., Ozorhon, B., and Eren, K, Critical success factors for partnering in the Turkish construction industry. "24th Annual ARCOM Conference", (2008), p.1013-1022.
  A.32 Dikmen, I., Birgonul M.T., and Ozorhon, B., Using Cognitive Maps to Explore the Impact of International Contracting Experience on Competitiveness. "5th International Conference on Innovation in Architecture, Engineering and Construction", (2008).
  A.33 Dikmen, I., Birgonul, M.T., Fidan, G. and Ozcan, G, A Risk and Vulnerability Ontology for Construction Projects. "PM-04 - 4th SCPM and 1st IPMA/MedNet Conference", (2008), p.137-142.
  A.34 Soibelman, L., Akinci, B., Ozcan, G., Dikmen, I and Birgonul M.T., International Collaborative Construction Management Course: A Teaching Case Study. "5th International Conference on Innovation in Architecture, Engineering and Construction", (2008).
  A.35 Budayan, C., Dikmen, I., and Birgonul, M. T., Modes of differentiation strategies in the construction industry. "International Research Symposium", 1, (2009), p.309-323.
  A.36 Ozorhon, B., Dikmen, I., and Birgonul, M. T., Structural equation modelling applications in construction management. "International Research Symposium", 1, (2009), p.175-188.
  A.37 Isik, Z., Arditi, D., Birgonul, M. T., and Dikmen, I., Impact of organizational competencies on construction project performance. "9th International Postgraduate Research Conference", 1, (2009), p.299-308.
  A.38 Arikan, A.E., Dikmen, I., and Birgonul, M.T., A Prototype Risk Management Decision Support Tool for Construction Projects. "CIB Joint International Symposium", 1, (2009), p.885-895.
  A.39 Ongel, B., Tanyer, A. M., Dikmen, İ., Risk Management Maturity Models: A Review and Future Directions for Improvement. "Fifth International Conference on Construction in the 21st Century (CITC-V)", 1, (2009), p.348-357.
  A.40 Soibelman, L., Akinci, B., Sacks, R., Dikmen, I., Birgonul, M.T., Formoso, C, Teaching Globalization Issues to Civil Engineering Students – The International Collaborative Construction Management Course. "Fifth International Conference on Construction in the 21st Century (CITC-V)", 1, (2009), p.1104-1112.
  A.41 Budayan, C., Dikmen, I., and Birgonul, M. T., Strategic Group Analysis by Using Fuzzy Clustering. "Fifth International Conference on Construction in the 21st Century (CITC-V)", 1, (2009), p.245-252.
  A.42 Isik, Z., Birgonul, M.T., and Dikmen, I., Determinants of Glocal Success in International Construction. "Fifth International Conference on Construction in the 21st Century (CITC-V)", 1, (2009), p.941-949.
  A.43 Yiğit, M.A., Birgonul, M.T., and Dikmen, I., Contract Management Behavior and Practices of Turkish Contractors at International Contracts. "Fifth International Conference on Construction in the 21st Century (CITC-V)", 1, (2009), p.884-892.
  A.44 Isik, Z., Arditi, D., Birgonul, M.T., and Dikmen, I., A Strategic Performance Measurement Framework for the Construction Industry. "Proceedings of the COBRA Conference", (2010).
  A.45 Fidan, G., Dikmen, I., and Birgonul, M.T., Using Multi Agent Systems in Construction Claim Negotiation. "Computing in Civil and Building Engineering, Proceedings of the International Conference", (2010), p.291.
  A.46 Dikmen, I., Birgonul, T., and Eybpoosh, M., Tracing Risk Paths in International Construction Projects: A Case Study. "Proc. of the Int. Conf. on Management and Innovation for a Sustainable Built Environment", (2011).
  A.47 Yildiz, A.E., Dikmen, I., Birgonul, T., Ercoskun, K., and Salten, S., A risk mapping tool for construction projects. "14th International Conference on Computing in Civil and Building Engineering", (2012).
  A.48 Yildiz, A.E., Dikmen, I., Birgonul, M.T., Ercoskun, K., and Salten, S., Risk mapping in construction projects. "Engineering Project Organization Conference", (2012).
  A.49 Daneshvar, M., Dikmen, I. and Birgonul, M.T., Investigation of organizational routines in construction companies. "Engineering Project Organization Conference", (2012).
  A.50 Yildiz, A.E., Dikmen, I., and Birgonul, M.T., Using Expert Opinion for Risk Assessment: A Case Study of a Construction Project Utilizing a Risk Mapping Tool. "27th IPMA World Congress", (2013).
  A.51 Bilgin, G., Birgonul, M.T., and Dikmen, I., Ontology Evaluation: An Example of Delay Analysis. "Creative Construction Conference 2014", (2014), p.144-149.
  A.52 Eken, G., Bilgin, G., Dikmen, I. and Birgonul, M. T., A Lessons Learned Database Structure for Construction Companies. "Proceedings of Creative Construction Conference 2015", (2015), p.184-192.
  A.53 Bilgin, G., Eken, G., Dikmen, I. and Birgonul, M.T., A Relational Database for Construction Delay. "Proceedings of the Eighth International Conference on Construction in the 21st Century (CITC-8)", (2015), p.286-293.
  A.54 Huseyin Erol, Irem Dikmen, M. Talat Birgönül, A Construction Delay Analysis Approach Based on Lean Principles. "25th Annual Conference of the International Group for Lean Construction (IGLC)", (2017).
  A.55 Gorkem Eken, Gozde Bilgin, Irem Dikmen, M. Talat Birgönül, Knowledge-Based Portfolio Management: A Taxonomy for Lessons Learned. "ISEC-9: Resilient Structures and Sustainable Construction", (2017).
  A.56 Gozde Bilgin, Gorkem Eken, Beste Ozyurt, Irem Dikmen, M. Talat Birgönül, Beliz O, Handling Project Dependencies in Portfolio Management. "International Conference on Project MANagement", (2017).
  A.57 Irem Dikmen, M. Talat Birgönül, Incorporating Sustainability in Risk Assessment of Construction Projects. "International Conference on Sustainable Futures-ICSF 2017", (2017).
  A.58 Beste Ozyurt, Gozde Bilgin, Irem Dikmen, M. Talat Birgönül, Similarity Assessment of Countries to Facilitate Learning from International Construction Projects. "ISEC-9: Resilient Structures and Sustainable Construction", (2017).

Book and Chapter in a Book

  A.1 Bon, R., Birgönül, T. and Özdoğan, İ., An Input-output Analysis of the Turkish Construction Sector, 1973-1990. "Economic Structure and Maturity", (2000), p.377-387.
  A.2 Bon, R., Birgönül, T. and Özdoğan, İ., Comparative Stability Analysis of Demand-side and Supply-side Input-output Models: The case of Turkey, 1973-1990. "Economic Structure and Maturity", (2000), p.163-171.
  A.3 Dikmen, I., Birgonul, M. T. and Ataoglu, T., Emprical Investigation of Organisational Learning Ability As a Performance Driver in Construction. "Knowledge Management in the Construction Industry: A Socio-Technical Perspective", (2005).
  A.4 Birgonul, M.T., Dikmen, I. and Ozorhon, B., The Impact of Reverse Knowledge Transfer on Domestic Market: The Case of Turkey. "Economics for the Modern Built Environment", (2009), p.273.
  A.5 Dikmen, I., Birgonul, M.T. and Atasoy, G., Best Value Procurement in Build Operate Transfer Projects: The Turkish Experience. "Policy, Finance and Management for Public-Private Partnerships", (2009), p.469.
  A.6 Dikmen, I., Birgonul, M.T. and Anac, C., Strategic Issues in Entering Emerging Markets. "Organization Management in Construction", (2011), p.114-129.
  A.7 Birgonul, M.T., Dikmen, I. and Ozenen, C.G., Public Private Partnership in Turkey. "Public Private Partnerships; A Global Review", (2015), p.337-352.

Publications (NATIONAL)

 

Conference Papers

  A.1 Birgönül, T. and Özdoğan (Dikmen), İ., Türk İnşaat Sektöründe "Kritik Yol Yöntemi" Uygulamaları ve Karşılaşılan Sorunlar. "2. Yapı İşletmesi kongresi", 1, (2000), s.31-42.
  A.2 Özdoğan (Dikmen), İ. and Birgönül, M.T., İnşaat Sektöründe Strateji Yönetimi. "2. Yapı İşletmesi Kongresi", 1, (2000), s.139-151.
  A.3 Birgönül, M.T. and Dikmen, İ., Türk İnşaat Sektörünün Rekabet Analizi. "XVI. Türkiye İnşaat Mühendisliği Teknik Kongre ve Sergisi", 1, (2001).
  A.4 İrem Dikmen, M.Talat Birgönül, Tunca Ataoğlu and Beliz Özorhon, Türk inşaat şirketlerinde kurumsal öğrenme: Mekanizmalar ve kültürel engeller. "XVII.Türkiye İnşaat Mühendisliği Teknik Kongresi ve Sergisi", (2004), s.555-557.
  A.5 Birgonul, M.T., Dikmen, I., Demirel, T. and Arikan, A.E., Yapım yönetiminde çağdaş egilimler ve güncel araştırma konuları. "3. Yapı İşletmesi Kongresi", (2005), s.13-31.
  A.6 Arikan, A.E., Dikmen, I. ve Birgonul, M.T., Bütünleşik bir risk yönetim karar destek sistemi. "3. Yapı İşletmesi Kongresi", (2005), s.90-101.
  A.7 Dikmen, I., Birgonul, M.T. ve Ozorhon, B., Uluslararası Pazar seçiminde bir ANP (Analytic Network Process) uygulaması. "3.Yapı İşletmesi Kongresi", (2005), s.162-171.
  A.8 Birgönül, M.T., Dikmen, İ., Özorhon, B. and Işık, Z., İnşaat Sektörünün Yapım Yönetimi Eğitiminden Beklentileri. "İnsaat Muhendisleri Odasi Istanbul Subesi", 1, (2007), s.169-179.
  A.9 Budayan, C., Dikmen, İ. and Birgönül, M.T., Türk İnşaat Sektöründe Stratejik Grup Analizi. "4. İnşaat Yönetimi Kongresi", 1, (2007), s.139-148.
  A.10 Dikmen, İ., Birgönül, M.T., Eybpoosh, M., Fidan, G. and Karakaş, K., Çok Aracılı Maliyet Tahmin ve Risk Paylaşım Sistemi. "1. Proje ve Yapım Yönetimi Kongresi", 1, (2010), s.643-654.
  A.11 Işık, Z., Arditi, D., Birgönül, M.T., and Dikmen, I., Yapım Sektörü’nde Performans Ölçümü için Kavramsal Bir Model. "1. Proje ve Yapım Yönetimi Kongresi", 1, (2010), s.1008-10019.
  A.12 Dikmen, İ., Birgönül, M.T. and Özer, A.H., Bütünleştirilmiş Süre – Maliyet Etki Ağı ile Aktivite Bazlı Bir Risk Değerlendirme Modeli. "1. Proje ve Yapım Yönetimi Kongresi", 1, (2010), s.977-988.
  A.13 B.Öngel, A.M.Tanyer, Dikmen I., İnşaat Şirketlerinde risk Yönetim Süreçlerinin Olgunluğunun Değerlendirilmesi. "1. Proje ve Yapım Yönetim Kongresi", 1, (2010), s.763-772.
  A.14 Dikmen, İ., Birgönül, M.T. and Arıkan, A.E., Uluslararası İnşaat Projeleri için Bütünleşik bir Risk Yönetim Modeli ve Yazılımı. "1. Proje ve Yapım Yönetimi Kongresi", 1, (2010), s.1102-1112.
  A.15 Budayan, C., Dikmen, İ. and Birgönül, M.T., Avrupa Ülkeleri Arasındaki İnşaat Maliyetlerinin Kıyaslanmasına Yönelik Bir Kümeleme Analizi. "2. Proje ve Yapım Yönetimi Kongresi", (2012), s.1189-1200.
  A.16 Yıldız, A.E., Dikmen, I., Birgönül, M.T., Ercoşkun, K., and Salten, S., İnşaat Projeleri İçin Bilgi-Tabanlı Risk Haritalama Aracının Geliştirilmesi. "2. Proje ve Yapım Yönetimi Kongresi", (2012), s.1117-1129.
  A.17 Sakın, A., Birgönül, M.T., and Dikmen, I., Yurtdışı Müteahhitlik Hizmetlerinde, Geçmişten Edinilen Derslerin Işığında Geleceğe Yönelik Öneriler. "2. Proje ve Yapım Yönetimi Kongresi", (2012), s.1461-1474.
  A.18 Bilgin, G., Birgonul, M.T., and Dikmen, I., İnşaat Projeleri için Gecikme Analizi: Gecikme Nedenleri ve Önleyici Tedbirlerinin Taksonomisi. "3. Proje ve Yapım Yönetimi Kongresi", (2014), s.339-350.
  A.19 Bilgin, G., Yıldız, A. E., Erol, H., Dikmen, I., Birgonul, M.T., and Ozorhon, B., İnşaat Projeleri için bir Portföy Yönetim Aracının Geliştirilmesi. "3. Proje ve Yapım Yönetimi Kongresi", (2014), s.363-375.
  A.20 Erol, H., Eken, G., Bilgin, G., Dikmen, I., and Birgonul, M.T., Yalın İnşaat Uygulamalarının 4-Boyutlu Model ile Gösterimi. "3. Proje ve Yapım Yönetimi Kongresi", (2014), s.351-362.
  A.21 B. Özyurt, G. Bilgin, G. Eken, İrem Dikmen, M. T. Birgönül, İnşaat Projelerinde Öğrenme: Benzerlik Değerlendirmesi için Kümeleme Analizi. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.246-257.
  A.22 G. Bilgin, G. Eken, B. Özyurt, İrem Dikmen, M. T. Birgönül, B. Özorhon, İnşaat Şirketleri İçin Bir Proje Portföy Yönetim Aracı: COPPMAN. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.233-245.
  A.23 B. Öngel, A. M. Tanyer, İrem Dikmen, Yüksek Performanslı Yeşil Bina Projelerindeki Kritik Başarı Faktörleri. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.98-111.
  A.24 H. Erol, B. Özyurt, G. Bilgin, G. Atasoy Özcan, M. T. Birgönül, İrem Dikmen, Lazer Tarayıcı Uygulamalarında Planlama: Bir Vaka Çalışması. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.742-756.
  A.25 M. Ayhan, M. T. Birgönül, İrem Dikmen, İnşaat Sözleşmelerinde Ortaya Çıkması Olası Uyuşmazlıkların Tahmin Edilmesi Üzerine Alternatif Bir Yaklaşım. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.1055-1066.
  A.26 S. Mohammadi, M. T. Birgönül, İrem Dikmen, Enerji Verimliliği Perspektifinden Türk İnşaat Sektörüne Bakış. "4. Proje ve Yapım Yönetimi Kongresi", (2016), s.1237-1246.
<< back