Academic Staff Roster includes academic activity information for 2017 and before; therefore the visible titles of faculty members may not be up to date. Academic activity information for 2018 and onwards can be tracked through AVESIS (Academic Data Management System).

Prof.Dr. HASAN YAZICIGİL
FACULTY OF ENGINEERING
PublicationsResearchMembership & Awards
E-mail :  
Url :  -
Phone :  
Fax :  
Address :
 

Education

  Bachelor's, Middle East Technical University, Geological Eng.
  Master's, IOWA STATE UNIVERSITY, Water Resources
  Doctorate, PURDUE UNIVERSITY, Civil Eng.

Research

Thesis Supervised

  A.1 Optimal Dewatering of the Collector Line in Aksaray Organized Industrial District,Aksaray-Turkey. Msc Thesis. Mehmet Tokgöz. (1999)
  A.2 Characterization of the Küçük Menderes River Basin Aquifer System. Msc Thesis. Koray Kamil Yılmaz. (1999)
  A.3 Groundwater Recharge Estimation for Küçük Menderes River Basin Aquifer System. Msc Thesis. Arzu Gündoğdu. (2000)
  A.4 Groundwater Management Policy Development for the Küçük Menderes River Basin Aquifer System. Msc Thesis. Jale Şakıyan. (2001)
  A.5 Dewatering Plan and Prediction for Pit Lake Flooding for a Quarry Site. Msc Thesis. Uygar Duru. (2004)
  A.6 Investigation of the Safe and Sustainable Yields for the Sandy Complex Aquifer System in ergene River Basin. Msc Thesis. Şebnem Ökten. (2004)
  A.7 Optimal Storage of Freshwater in Saline Aquifers. Msc Thesis. M. Deniz Küstü. (2005)
  A.8 Modeling of Mogan and Eymir Lakes Aquifer System. Phd Thesis. Özlem Yağbasan. (2007)
  A.9 INVESTIGATION OF RECHARGE AND DISCHARGE MECHANISMS OF A MULTI-AQUIFER SYSTEM USING ENVIRONMENTAL ISOTOPES. Phd Thesis. ŞEBNEM ARSLAN. (2008)
  A.10 SUSTAINABLE MANAGEMENT OF ULUBEY AQUIFER SYSTEM, USAK, TURKEY. Msc Thesis. BURCU ÜNSAL ERDEMLİ. (2008)
  A.11 ARTIFICIAL RECHARGE OF GROUNDWATER IN KÜÇÜK MENDERES BASIN. Msc Thesis. AYŞE PEKSEZER. (2010)
  A.12 ASSESSMENT OF WATER SUPPLY IMPACTS FOR A MINE SITE IN WESTERN TURKEY. Msc Thesis. ELİF AĞARTAN. (2010)
  A.13 ASSESSMENT OF DEWATERING REQUIREMENTS FOR ÇALDAĞ NICKEL MINE IN WESTERN TURKEY. Msc Thesis. ÇİĞDEM CANKARA. (2011)
  A.14 ASSESSMENT OF OPEN PIT DEWATERING REQUIREMENTS AND PIT LAKE FORMATION FOR KIŞLADAĞ GOLD MINE, UŞAK-TURKEY. Phd Thesis. BURCU ÜNSAL. (2013)
  A.15 HYDROGEOLOGICAL CHARACTERIZATION OF THE NORTHERN PART OF THE KIŞLADAĞ GOLD-MINE, UŞAK, TURKEY. Msc Thesis. EGEMEN FIRAT. (2013)
  A.16 OPTIMUM COVER DESIGN FOR WASTE ROCK STORAGE AREAS. Msc Thesis. ÇİDEM ARGUNHAN. (2014)
  A.17 HYDROGEOLOGICAL CHARACTERIZATION OF ÇELTİKÇİ COAL BASIN. Msc Thesis. CANSU KAHRAMAN. (2014)
  A.18 NUMERICAL MODELING OF GROUNDWATER FLOW AT A COAL EXPLORATION SITE IN ESKİŞEHİR - TURKEY. Msc Thesis. HATİCE KILIÇ. (2016)
  A.19 HYDROGEOLOGICAL CHARACTERIZATION OF THE ALPU COAL MINE EXPLORATION SITE IN ESKISEHIR-TURKEY. Msc Thesis. MERT ONURSAL ÇATAK. (2016)

Project Work

  A.1 Revize Hidrojeolojik Etütler Kapsamında K. Menderes Havzası Yeraltısularının İncelenmesi ve Yönetimi. DSİ, 1 FEBRUARY 1998 - 1 OCTOBER 2000. Coordinator .
  A.2 Fethiye Özel Çevre Koruma Bölgesi Su Kaynakları Yönetimi. Özel Çevre Koruma Kurumu Başkanlığı, 1 JULY 1998 - 1 DECEMBER 1999. Researcher .
  A.3 Metal İyonların Atık Sahası Taban Kil-Örtüsündeki Dağılım ve Difüzyon Katsayılarının Araştırılması. TÜBİTAK, 1 JANUARY 1998 - 1 SEPTEMBER 2000. Coordinator .
  A.4 Yenişehir Belediyesi Yerleşim Alanı Jeolojik/Jeoteknik İncelemesi. Yenişehir Belediyesi, 1 NOVEMBER 1999 - 1 FEBRUARY 2000. Researcher .
  A.5 Hydrogeology-Hydrogeochemistry Baseline Study of the Kazan Trona Project Area, Ankara, Turkey. RioTur Mining Company, 1 JULY 2000 - 1 AUGUST 2001. Coordinator .
  A.6 Demirtaş Belediyesi Yerleşim Alanı Jeolojik/Jeoteknik İncelemesi. Demirtaş Belediyesi, 1 JANUARY 2000 - 1 MAY 2000. Researcher .
  A.7 Gümüşkol Maden Projesi için Su Potansiyeli Olan Sahaların Belirlenmesi. TÜPRAG Metal Madencilik San. ve Tic. Ltd. Şti., 1 JUNE 2000 - 1 JULY 2000. Coordinator .
  A.8 Optimal Management of Transboundary Ceylanpınar Aquifer. Natural and Applied Sciences Institute, BAP-1, 1 JANUARY 2005 - 1 DECEMBER 2005. Coordinator .
  A.9 Investigation of Recharge and Discharge Mechanisms in Multiple Aquifers Using Env.Isotopes & Noble Gases. TUBİTAK Projects , 1 APRIL 2007 - 1 DECEMBER 2007. Local Coordinator .
  A.10 Hydrogeological Investigation of Ulubey Aquifer-Uşak. DSİM Projects , 1 FEBRUARY 2007 - 1 SEPTEMBER 2007. Local Coordinator .
  A.11 Development of Groundwater Management Plan for the Ulubey Aquifer System in Uşak. DSİM Projects , 1 MARCH 2007 - 1 OCTOBER 2007. Local Coordinator .
  A.12 Investigation of surface water potential for the Kışladağ mine. DSİM Projects , 1 OCTOBER 2010 - 1 FEBRUARY 2011. Local Coordinator .
  A.13 Investigation of Surface Water Potential for Kışladağ Gold Mine. DSİM Projects , 1 OCTOBER 2010 - 1 FEBRUARY 2011. Local Coordinator .
  A.14 Investigation of potential impacts of additional water supply for the Kışladağ mine on groundwater resources. DSİM Projects , 1 JUNE 2010 - 1 AUGUST 2010. Local Coordinator .
  A.15 Investigation of Probable Impacts of Exploration Drillings on Madra Dam for Kıratlı Project. DSİM Projects , 1 JANUARY 2011 - 1 FEBRUARY 2011. Local Coordinator .
  A.16 Hydrogeological Investigation of the New Leach Pad and Waste rock Storage Areas for the Kışladağ Gold Mine, Modeling of Groundwater, and Development of Dewatering Plan. DSİM Projects , 1 JULY 2011 - 1 DECEMBER 2012. Local Coordinator .
  A.17 Hydrogeological Investigation and Characterization of Çeltikçi Coal Basin. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) İKA Mining Inc., 1 DECEMBER 2011 - 1 DECEMBER 2013. Local Coordinator .
  A.18 Hydrogeological Investigation of the New Leach Pad and Waste Rock Storage Areas for the Kışladağ Gold Mine, Modeling of Groundwater and Development of Dewatering Plan. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) Tüprag Metal Mining Inc., 1 JULY 2011 - 1 MAY 2013. Local Coordinator .
  A.19 Hydrogeological Investigation of the New Leach Pad and Waste Rock Storage Areas for the Kışladağ Gold Mine, Modeling of Groundwater, and Development of Dewatering Plan. DSİM Projects , 1 JULY 2011 - 1 DECEMBER 2012. Local Coordinator .
  A.20 Hydrogeological Investigation and Characterization of Çeltikçi Coal Basin. DSİM Projects , 1 DECEMBER 2011 - 1 MARCH 2013. Local Coordinator .
  A.21 Hydrogeological Investigation and Characterization of Çeltikçi Coal Basin. DSİM Projects , 1 DECEMBER 2011 - 1 MARCH 2013. Local Coordinator .
  A.22 Hydrogeological Investigation of Kışladağ Gold Mine. DSİM Projects , 1 NOVEMBER 2012 - 1 FEBRUARY 2013. Local Coordinator .
  A.23 Hydrogeological Assessment of Çaldağ Nickel Project Site. DSİM Projects , 1 OCTOBER 2012 - 1 MARCH 2013. Local Coordinator .
  A.24 Hydrogeological Assessment of Çaldağ Nickel Project Site. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) Çaldağ Nickel Mining Inc., 1 OCTOBER 2012 - 1 MARCH 2013. Local Coordinator .
  A.25 Assessment of Impacts of Çöpler Complex Mine Tailings Pond on Sabırlı Village in Case of a Probable Disaster or Accident. DSİM Projects , 1 MAY 2012 - 1 JULY 2012. Local Coordinator .
  A.26 Hydrogeological ınvestigation and Characterization of Sisorta Gold Mine Area. DSİM Projects , 1 MAY 2012 - 1 NOVEMBER 2012. Local Coordinator .
  A.27 Prediction of Pit Lake Formation in Kışladağ Gold Mine. DSİM Projects , 1 DECEMBER 2012 - 1 MAY 2013. Local Coordinator .
  A.28 Hydrogeological Consulting. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments Çaldağ Nickel Mining Inc., 1 JUNE 2013 - 1 JULY 2013. Local Coordinator .
  A.29 Hydrogeological Consulting. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments Anagold Mining Inc., 1 FEBRUARY 2013 - 1 MARCH 2013. Local Coordinator .
  A.30 Hydrogeological Consulting. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments Anagold Mining Inc., 1 MAY 2013 - 1 JUNE 2013. Local Coordinator .
  A.31 Hydrogeological Consulting. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments Anagold Mining Inc., 1 MARCH 2013 - 1 APRIL 2013. Local Coordinator .
  A.32 Assessment of Potential Impacts of Dewatering and Spent Ore Site on Groundwater Resources at Çaldağ Nickel Project Area. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) Çaldağ Nickel Mining Inc., 1 SEPTEMBER 2013 - 1 DECEMBER 2013. Local Coordinator .
  A.33 Assessment of Water Supply for the Çeltikçi Coal Mine and Thermal Power Plant. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 OCTOBER 2014 - 1 JUNE 2015. Local Coordinator .
  A.34 Development of Groundwater Flow Model for the Çeltikçi Coal Basin, Design of Dewatering and Assessment of Potential Impacts on Groundwater Resources. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 FEBRUARY 2014 - 1 AUGUST 2015. Local Coordinator .
  A.35 Development of Groundwater Flow Model for the Çeltikçi Coal Basin, Design of Dewatering and Assessment of Potential Impacts on Groundwater Resources-Additional Contract. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 SEPTEMBER 2014 - 1 AUGUST 2015. Local Coordinator .
  A.36 Esan-Alpu Kömür Sahasının Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2014 - 1 FEBRUARY 2016. Local Coordinator .
  A.37 Development of Groundwater Flow Model for the Çeltikçi Coal Basin, Design of Dewatering and Assessment of Potential Impacts on Groundwater Resources. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 FEBRUARY 2014 - 1 AUGUST 2015. Local Coordinator .
  A.38 Assessment of Water Supply for the Çeltikçi Coal Mine and Thermal Power Plant. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 OCTOBER 2014 - 1 JUNE 2015. Local Coordinator .
  A.39 Consultancy services in the areas of hydrogeology, water management, water supply, and environmental impact assessment. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 OCTOBER 2014 - 1 JANUARY 2015. Local Coordinator .
  A.40 Development of Groundwater Flow Model for the Çeltikçi Coal Basin, Design of Dewatering and Assessment of Potential Impacts on Groundwater Resources-Additional Contract. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 SEPTEMBER 2014 - 1 AUGUST 2015. Local Coordinator .
  A.41 Hydrogeological Investigation and Characterization of Esan-Alpu Coal Field. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2014 - 1 FEBRUARY 2015. Local Coordinator .
  A.42 Consultancy services in the areas of hydrogeology, water management, water supply, and environmental impact assessment. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 NOVEMBER 2014 - 1 FEBRUARY 2015. Local Coordinator .
  A.43 Hydrogeological Investigation and Characterization of Esan-Alpu Coal Field. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2014 - 1 FEBRUARY 2016. Local Coordinator .
  A.44 Assessment of Bottom Liner Impermeability for Tailings Storage facility of Çöğler Complex Mine. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2015 - 1 JULY 2015. Local Coordinator .
  A.45 Consultancy services in the areas of hydrogeology and water supply. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 DECEMBER 2015 - 1 FEBRUARY 2016. Local Coordinator .
  A.46 Consultancy services in the areas of hydrogeology, water management, water supply, and environmental impact assessment. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MARCH 2015 - 1 AUGUST 2015. Local Coordinator .
  A.47 Consultancy services in the areas of hydrogeology and water supply. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 OCTOBER 2015 - 1 NOVEMBER 2015. Local Coordinator .
  A.48 Consultancy services in the areas of hydrogeology and hydrology. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 SEPTEMBER 2015 - 1 NOVEMBER 2015. Local Coordinator .
  A.49 Consultancy services in the areas of hydrogeology, water management, water supply, and environmental impact assessment. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 SEPTEMBER 2015 - 1 DECEMBER 2015. Local Coordinator .
  A.50 Consultancy services in the areas of hydrogeology, water management, water supply, and environmental impact assessment. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MAY 2015 - 1 JUNE 2015. Local Coordinator .
  A.51 Consultancy Services in the Areas of Hydrogeology and Water Suppy. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 DECEMBER 2015 - 1 FEBRUARY 2016. Local Coordinator .
  A.52 Alpu Kömür Havzasının (A, B, C,D, E, ve F Sektörleri) Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2016 - 1 DECEMBER 2017. Local Coordinator .
  A.53 Consultancy Services in the Areas of Hydrogeology and Water Supply. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 MAY 2016 - 1 OCTOBER 2016. Local Coordinator .
  A.54 Esan-Alpu Kömür Sahası Yeraltısularının İzlenmesi ve Akım Modelinin Geliştirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 DECEMBER 2016. Local Coordinator .
  A.55 Alpu Kömür Havzasının (A, B, C, D, E, ve F Sektörleri) Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 DECEMBER 2016 - 1 DECEMBER 2017. Local Coordinator .
  A.56 Çöpler Kompleks Madeni Atık Depolama Tesisinin Olası Kaza ve Afet Durumunda Çöpler ve Sabırlı Köyleri Yerleşkelerine Etkilerinin Değerlendirilmesi. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 AUGUST 2016. Researcher .
  A.57 Consultancy Services in the Areas of Hydrogeology and water supply. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 NOVEMBER 2016 - 1 APRIL 2017. Local Coordinator .
  A.58 Consultancy services in the areas of hydrogeology and water supply. AGUDOS Project, Consultancy, Test and Experiments. Consultancy, Test and Experiments , 1 NOVEMBER 2016 - 1 APRIL 2017. Local Coordinator .
  A.59 Esan-TKİ A-Sektörü Kömür Sahasının Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JUNE 2016 - 1 DECEMBER 2016. Local Coordinator .
  A.60 AECOM – ACAICA Bakır İşletme Sahasının Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 AUGUST 2016 - 1 MARCH 2017. Local Coordinator .
  A.61 Çöpler Açık Ocak Madeninde Şev Duraylılığı için Optimum Yeraltısuyu Kontrolü Arge Projesi. Teknokent Project and Consultancy Teknokent Project and Consultancy Hacettepe Teknokent'de yürütülen proje, 1 FEBRUARY 2017 - 1 FEBRUARY 2018. Local Coordinator .
  A.62 AECOM-ACAICA Bakır İşletme Sahasının Hidrojeolojik Etüdü ve Karakterizasyonu. AGUDOS Project, Consultancy, Test and Experiments. Projects (including SAYP) , 1 JANUARY 2017 - 1 MARCH 2017. Local Coordinator .

Consultancy and Expert Reports

  A.1 Eurogold A.Ş.'nin Ovacık Altın Madeni Hidrojeolojik Risk Değerlendirmesi. TÜBİTAK, (9.1999)
<< back